BLADE CARRIER REMOVAL
Remove cotter pin and loosen slotted nut on gearbox shaft. Loosen but do not remove the nut until the blade
carrier is loosened. Use a suitable 2 jaw gear puller to pull carrier off tapered gearbox shaft. If gear puller is not
available use long bar inserted through blade bolt access hole with end against rotor bar. Strike opposite end of
bar with sledge hammer. Rotate blade carrier 180 degrees and repeat process.
BLADE CARRIER INSTALLATION
Clean the splines on both the blade carrier and output shaft. Position carrier on the gearbox output shaft and
install special washer nut.
Tighten nut holding blade carrier to minimum 350 ft. pounds, strike the carrier near the hub several times with a
heavy hammer to seat the hub. Use a suitable spacer over the nut to prevent damage to the nut and threads.
Retighten the nut to 350 ft. pounds. Install cotter pin and spread.
Always recheck gearbox output shaft slotted blade carrier retaining nut torque after a few
hours operation.
Avoid personal injury. Do not work under cutter without support blocks to keep frame from
falling.
STORAGE
Your rotary cutter represents an investment from which you should get the greatest possible benefit. Therefore,
when the season is over, the cutter should be thoroughly checked and prepared for storage so that a minimum
amount of work will be required to put it back into operation for the next season. The following are suggested
storage procedures:
1. Thoroughly clean the cutter.
2. Lubricate the cutter as covered in Maintenance Section.
3. Tighten all bolts and pins to the recommended torque.
4. Check the cutter for worn or damaged parts. Make replacements immediately.
5. Store the cutter in a clean, dry place with the cutter housing resting on blocks.
6. Use spray touch-up enamel where necessary to prevent rust and maintain the appearance of the cutter.
Summary of Contents for SE42
Page 7: ...Safety Section 1 1 2008 Alamo Group Inc SAFETY SECTION...
Page 30: ......
Page 31: ......
Page 32: ......
Page 33: ......
Page 34: ......
Page 35: ......
Page 36: ......
Page 37: ......
Page 38: ......
Page 39: ......
Page 40: ......
Page 41: ......
Page 42: ......
Page 43: ......
Page 44: ......
Page 45: ......
Page 46: ......
Page 47: ......
Page 48: ......
Page 49: ......
Page 50: ......
Page 51: ......
Page 52: ......
Page 53: ......
Page 54: ......
Page 55: ......
Page 56: ......
Page 57: ......
Page 58: ......
Page 59: ......
Page 60: ......
Page 61: ......
Page 62: ......
Page 63: ......
Page 64: ......
Page 65: ......
Page 66: ......
Page 67: ......
Page 68: ......
Page 69: ......
Page 70: ......
Page 71: ......
Page 72: ......
Page 73: ......
Page 74: ......
Page 75: ...Introduction Section 2 1 2008 Alamo Group Inc INTRODUCTION SECTION...
Page 79: ...Assembly Section 3 1 2008 Alamo Group Inc ASSEMBLY SECTION...
Page 83: ...Operation Section 4 1 2008 Alamo Group Inc OPERATION SECTION...
Page 125: ...Maintenance Section 5 1 2008 Alamo Group Inc MAINTENANCE SECTION...
Page 138: ...SE42 SOM 03 08 P N 00774438C Printed U S A SE42 ROTARY MOWER...