
ASSEMBLY
SE10-4A/SE15-4A 03/09
Assembly Section 3-5
© 2009 Alamo Group Inc.
ASSEMBL
Y
DRIVELINE CLAMP CONE YOKE
OPERATING INSTRUCTIONS
Loosen the yoke clamp cone with a 11/16” (17mm) wrench and
remove the cone from yoke. Slide yoke onto the shaft and align
hole for clamping cone with annular groove of gearbox shaft.
Reinstall cone and tighten (75 lb-ft torque). Push and pull the
driveline to ensure it is securely attached to the shaft. Regularly
check the driveline yoke to ensure a tight connection. To remove
the yoke, remove the connecting cone and pull yoke off the
shaft. If the cone cannot be easily removed by hand, drive it out
from the other side using a hammer and punch.
NOTE: The clamping cone is serviced only as a complete
assembly. Do not attempt to disassemble the clamping cone.
7.
Install Center Divider Gearbox Shield. Remove the top two bolts and lockwashers from the Center
Gearbox. Install the shield on the Center Divider Gearbox and replace with longer hardware.
8.
Install opposite end of Wing Driveline to outer Gearbox input shaft. Secure yoke on shaft by tightening
taper pin to 75 ft/lbs. located on Driveline Clamp.
NOTE: To facilitate removal of Clutches and Yokes from
splined shafts in the future, it would help to place a small amount of lubricating grease on the splines
before installation.
9.
Install Center Section Hydraulic Lift Cylinder with base end attached to Spring Support. Note: See
hydraulic schematic for more details.
Summary of Contents for SE10-4A
Page 7: ...Safety Section 1 1 2009 Alamo Group Inc SAFETY SECTION...
Page 37: ......
Page 38: ......
Page 39: ......
Page 40: ......
Page 41: ......
Page 42: ......
Page 43: ......
Page 44: ......
Page 45: ......
Page 46: ......
Page 47: ......
Page 48: ......
Page 49: ......
Page 50: ......
Page 51: ......
Page 52: ......
Page 53: ......
Page 54: ......
Page 55: ......
Page 56: ......
Page 57: ......
Page 58: ......
Page 59: ......
Page 60: ......
Page 61: ......
Page 62: ......
Page 63: ......
Page 64: ......
Page 65: ......
Page 66: ......
Page 67: ......
Page 68: ......
Page 69: ......
Page 70: ......
Page 71: ......
Page 72: ......
Page 73: ......
Page 74: ......
Page 75: ......
Page 76: ......
Page 77: ......
Page 78: ......
Page 79: ......
Page 80: ......
Page 81: ...Introduction Section 2 1 2009 Alamo Group Inc INTRODUCTION SECTION...
Page 85: ...Assembly Section 3 1 2009 Alamo Group Inc ASSEMBLY SECTION...
Page 97: ...Operation Section 4 1 2009 Alamo Group Inc OPERATION SECTION...
Page 144: ......
Page 145: ...Maintenance Section 5 1 2009 Alamo Group Inc MAINTENANCE SECTION...
Page 147: ...MAINTENANCE SE10 4A SE15 4A 03 09 Maintenance Section 5 3 2009 Alamo Group Inc MAINTENANCE...
Page 165: ......