OPERATION
4211-4211SS 01/11
Operation Section 4-42
© 2011 Alamo Group Inc.
OPERA
T
ION
10.2 Hauling the Tractor and Implement
Before transporting a loaded tractor and implement,
measure the height and width dimensions and gross
weight of the complete loaded unit. Ensure that the
load will be in compliance with the legal limits set for
the areas that will be traveled through.
OPS-U- 0024
Use adequately sized and rated trailers and
equipment to transport the tractor and implement.
Consult an authorized dealer to determine the proper
equipment required. Using adequately sized chains,
heavy duty straps, cables and/or binders, securely tie
down both the front and rear of the tractor utilizing the
proper tie down locations as specified by the tractor
manufacturer.
OPS-U- 0025
Summary of Contents for LOADER 4211
Page 5: ...Safety Section 1 1 SAFETY SECTION ...
Page 29: ...Introduction Section 2 1 INTRODUCTION SECTION ...
Page 34: ......
Page 35: ...Assembly Section 3 1 ASSEMBLY AND CONNECTING THE LOADER SECTION ...
Page 46: ......
Page 47: ...Operation Section 4 1 OPERATION SECTION ...
Page 90: ......
Page 91: ...Maintenance Section 5 1 MAINTENANCE SECTION ...
Page 100: ...MAINTENANCE 4211 4211SS 01 11 Maintenance Section 5 10 2011 Alamo Group Inc MAINTENANCE ...
Page 101: ...MAINTENANCE 4211 4211SS 01 11 Maintenance Section 5 11 2011 Alamo Group Inc MAINTENANCE ...
Page 104: ...4211 4211SS SOM 01 11 P N F 3753C Printed U S A 4211 4211SS LOADER ...