OPERATION
4211B 02/10
Operation Section 4-8
© 2010 Alamo Group Inc.
OPERA
T
ION
3.3 Tractor Ballast
Before operating tractor and loader, add sufficient counterweight so a minimum of 25% of the
total weight is on the rear axle. Total weight includes weight of: tractor, loader, rated load in
bucket, and counterweight. Rated load is lift capacity at full height at 500mm forward of
bucket pivot point (See Standard Equipment and Specifications). When determining required
counterweight bucket should be at maximum forward position (bucket pivot point at the same
height as boom pivot point on mast).
4. Getting On and Off the Tractor
To ensure tractor stability when operating add
wheel ballast or rear weights to rear tractor tires.
For better stability, use tractor with wide front axle
rather than tricycle front wheels. Move wheels to
the tractor manufacturer’s widest recommended
settings to increase stability. If 3-Point hitch
counterweights are used, they should be carried
as low as possible at all times to maximize stability.
Effective counterbalance weight at rear axle of
mounted rear equipment is determined by
multiplying actual weight of equipment by 1.50.
EXAMPLE:
Equipment weighing 800 pounds,
attached to tractor, multiplied by 1.50, equals 1200
pounds of effective counterbalance weight at rear
axle.
A tractor that does not meet this criteria is
DANGEROUS and should not be operated as
upset of the unit can occur resulting in possible
serious injury and property damage.
OPS-L-
0001_A
Do not mount or dismount the Tractor while the tractor is moving. Mount
the Tractor only when the Tractor and all moving parts are completely
stopped.
(SG-12)
Before getting onto the tractor, the operator must read and completely understand the implement and tractor
operator manuals. If any part of either manual is not completely understood, consult an authorized dealer for
a complete explanation.
OPS-L- 0022
Summary of Contents for 4211B
Page 5: ...Safety Section 1 1 SAFETY SECTION...
Page 28: ......
Page 29: ...Introduction Section 2 1 INTRODUCTION SECTION...
Page 34: ......
Page 35: ...Assembly Section 3 1 ASSEMBLY AND CONNECTING THE LOADER SECTION...
Page 46: ......
Page 47: ...Operation Section 4 1 OPERATION SECTION...
Page 90: ......
Page 91: ...Maintenance Section 5 1 2010 Alamo Group Inc MAINTENANCE SECTION...
Page 100: ...MAINTENANCE 4211B 02 10 Maintenance Section 5 10 2010 Alamo Group Inc MAINTENANCE...
Page 101: ...MAINTENANCE 4211B 02 10 Maintenance Section 5 11 2010 Alamo Group Inc MAINTENANCE...
Page 104: ...4211B SOM 02 10 P N F 4253C Printed U S A 4211B LOADER...