PNET Operators Manual
PNET -OP-2022
Chapter 6
Installation process
13
6.5
Rheonics sensor will appear in topology view.
Figure 13. Rheonics sensor as it appears in Topology View.
6.6
Connect the Rheonics sensor SMET to the PLC
6.6.1
Drag & drop the connection.
Figure 14. Screenshot showing Module Definition-Module Info.