Triton
Service Manual SVC1020T ; Rev 4
80 and 100 gallon chassis
Triton Servicing: Burner Assembly
54
13. Reconnect the ground to the igniter and reconnect the lead to the control box
14. Reconnect the lead from the flame rod sensor to the control box.
15. Reconnect the two leads to the low gas pressure. (It does not matter which lead is connected to which tab.)
16. Reconnect the two harnesses to the front of the blower.
17. Reattach the cable harness to the top of the valve and secure it with the screw.
18. Reattach the intake hose to the front of the gas valve and the POF switch to the bottom of the blower.
Summary of Contents for TRITON
Page 8: ...Triton Service Manual SVC1020T Rev 4 80 and 100 gallon chassis Wiring and Schematic Diagram 8 ...
Page 9: ...Triton Service Manual SVC1020T Rev 4 80 and 100 gallon chassis Connection Diagram 9 ...
Page 14: ...Triton Service Manual SVC1020T Rev 4 80 and 100 gallon chassis User Interface 14 ...
Page 15: ...Triton Service Manual SVC1020T Rev 4 80 and 100 gallon chassis User Interface 15 ...
Page 16: ...Triton Service Manual SVC1020T Rev 4 80 and 100 gallon chassis User Interface 16 ...
Page 17: ...Triton Service Manual SVC1020T Rev 4 80 and 100 gallon chassis User Interface 17 ...
Page 20: ...Triton Service Manual SVC1020T Rev 4 80 and 100 gallon chassis Sequence of Events 20 ...
Page 21: ...Triton Service Manual SVC1020T Rev 4 80 and 100 gallon chassis Sequence of Events 21 ...
Page 46: ...4 6 Triton Service Manual SVC1020T Rev 4 80 and 100 gallon chassis Notes ...
Page 57: ...BACnet Configurations Triton Service Manual SVC1020T Rev 4 80 and 100 gallon chassis 5 7 ...