![Rheem Solar Premier Loline 590160 Owner'S Manual And Installation Instructions Download Page 31](http://html1.mh-extra.com/html/rheem/solar-premier-loline-590160/solar-premier-loline-590160_owners-manual-and-installation-instructions_1451560031.webp)
INSTALLATION – SOLAR STORAGE TANK
31
TYPICAL INSTALLATION
– TANK MOUNTED GAS BOOSTER 20L, 26L
Solar Premier Loline 160 Water Heater (Outdoor Tank Location)
with Tank Mounted In-Series 20L, 26L Gas Booster
SOLAR PREHEAT
(HOT WATER) OUTLET
Use a union connection
& insulate hot water pipe.
FRONT
COVER
SOLAR CIRCUIT
PRESSURE RELIEF VALVE
AND DRAIN LINE
CABLE TIE
MOUNT
CABLE TIE
TO PIPE INSULATION
GAS BOOSTER
WATER HEATER
TEMPERATURE
PRESSURE
RELIEF VALVE
(on right hand side
of tank)
POWER SUPPLY CORD
All electrical work must
be carried out by a
licensed electrical worker.
Power outlet must be
earthed & weatherproof.
SOLAR MONITOR
BASE
Level, stable, impervious
base, designed, to avoid ponding.
POWER SUPPLY CORD
All electrical work must be carried
out by a licenced tradesperson.
Power outlet must be earthed &
weatherproof.
COLD WATER
CONNECTION
Cold water connection
must comply with local
regulations.
SOLAR PREHEAT
INLET
Use a union connection
& insulate pipe.
HOT WATER OUTLET
Use a union connection
& insulate hot water pipe.
INSULATED HOT
WATER PIPE
GAS SUPPLY PIPE
Isolating valve &
union must be used.
SOLAR COLD PIPE
Insulated copper
pipe.Use a
compression
nut and olive.
HOT SENSOR LEAD
SENSOR
CONNECTION
SOLAR HOT PIPE
Insulated copper pipe.
Use a compression
nut and olive.
TPR VALVE DRAIN LINE
Drainline must terminate
away from the base of the
water heater. Discharge
point must comply with
AS/NZS 3500.4
OUTDOOR INSTALLATION
SOLAR DRAIN BACK 160 with
INTEGRATED GAS BOOST
SK6545
11/18 REV ED
FLUE OUTLET
Clearances must
comply with AS 5601 or
AS/NZS 5601.1 as applicable
under local regulations.
WALL BRACKET