INSTALLATION – SOLAR STORAGE TANK
21
ASSEMBLY OF COLD WATER SUPPLY AND SOLAR PIPE CONNECTIONS
Use thread sealing tape or approved thread sealant on all fittings.
All compression fittings must use brass or copper olives.
Ensure the air bleed valve is open when filling collectors.
HOT WATER OUTLET
Provide a union for disconnection. Insulate pipe.
COLD WATER INLET
See cold water connection detail as applicable to your local requirements. Provide
a union for disconnection.
RELIEF VALVE
A drain pipe must be fitted (refer to page 30).
BLEED VALVE
A drain pipe must be fitted (refer to page 30).
SCHEMATIC OF 2 TEMPERATURE ZONES
USING A TEMPERATURE LIMITING DEVICE
COLD WATER CONNECTION DETAIL