
12
ROOFTOP UNI
COUNTER FLA
GA
S
KET
NAILER
S
TRIP
DUCT*
ROOFCURB
IN
S
ULATION*
CANT
S
TRIP*
ROOF FE
IN
S
ULATI
ROOF DE
TURAL
ER*
FIGURE 11
ROOFCURB
FIGURE 10
ROOFCURB
RETURN DUCT
*
S
UPPLY DUCT
*
NAILING
S
TRIP
IN
S
ULATION PANEL
S
(2)
S
UPPLIED
GA
S
KET
(FULL PERIMETER
AND ON DIVIDER
S
,
MU
S
T BE ABOVE DUCT
AND IN
S
ULATION
PANEL FLANGE
S
.)
HOLD
DOWN
BRACKET
TYP. (4) PLC
S
.
UNIT
I296
S
T-A0
8
01-19-01
CORNER WEIGHTS BY PERCENTAGE
A
B
C
D
22%
27%
23%
2
8
%
S
PREADER BAR
A
B
D
C
LIFTING BEAM
CABLE OR CHAIN
5/
8
S
HACKLE
(EACH CORNER)
3
8
.25
25.75
C.G.
S
T-A0
8
01-19-01
ROOFTOP UNIT
COUNTER FLA
S
HING*
IN
S
ULATION*
CANT
S
TRIP*
ROOF FELT*
IN
S
ULATION*
ROOF DECK*
*BY CONTRACTOR
ROOF
S
TRUCTURAL
MEMBER*
ROOFCURB
DUCT*
NAILER
S
TRIP
GA
S
KET
RETURN
SUPPLY
FIGURE 9
LIFTING DETAIL
Summary of Contents for RKNL 13 SEER (3-5 TONS) SERIES
Page 25: ...25 FIGURE 20 FIGURE 21 INTEGRATED FURNACE CONTROL SPEED TAP BLOCK FIGURE 22 ...
Page 26: ...26 FIGURE 22 Continued ...
Page 79: ...79 FIGURE 23 WIRING DIAGRAM ...
Page 80: ...80 FIGURE 24 WIRING DIAGRAM ...
Page 81: ...81 FIGURE 25 WIRING DIAGRAM ...
Page 82: ...82 FIGURE 26 WIRING DIAGRAM ...
Page 83: ...83 FIGURE 27 WIRING DIAGRAM ...
Page 84: ...84 FIGURE 28 WIRING DIAGRAM ...
Page 85: ...85 FIGURE 29 WIRING DIAGRAM ...
Page 87: ...87 FIGURE 31 SYSTEM CHARGE CHARTS 3 5 TON COOLING 13 14 SEER ...
Page 88: ...88 FIGURE 32 SYSTEM CHARGE CHARTS 4 TON COOLING 13 14 SEER ...
Page 89: ...89 FIGURE 33 SYSTEM CHARGE CHARTS 5 TON COOLING 13 SEER ...
Page 94: ...94 ...
Page 95: ...95 ...
Page 96: ...96 CM 0606 ...