
Fie
ld C
on
ve
rsio
ns
ST-A1194-35-01
Notes:
Checklist:
__ VERIFY ALL HOSES ARE SECURE AND FULLY SEATED.
__ CONFIRM THAT ALL HOSES ARE FREE OF KINKS.
__ CONFIRM ALL HOSES AND OTHER DRAIN PARTS HAVE A
SLOPE IN DIRECTION OF WATER FLOW.
__ BOTH WORM DRIVES ON THE HOSE CLAMPS OF THE FLUE TRANSITION
MUST BE LOCATED ON THE TOP OF THE COUPLING. SEE LOCATION
DETAIL IN THE GENERAL CONVERSION INSTRUCTIONS AT THE
BEGINNING OF THIS SECTION.
__ ALL CLAMPS AND COUPLINGS ARE TIGHTENED
__ ALL DRAIN PORTS ARE PLUGGED.
__ UNIT HAS FORWARD PITCH.
__ HEAT TAPE INSTALLED(IF REQUIRED)
41
Summary of Contents for *96V series
Page 34: ...Field Conversions 34...
Page 35: ...Field Conversions 35...
Page 36: ...36 Field Conversions...
Page 37: ...37 Field Conversions...
Page 38: ...Field Conversions 38...
Page 112: ...112 Diagnostics TABLE 20 continued R96V FAULT CODES WITH DESCRIPTIONS AND SOLUTIONS...
Page 117: ...117 TABLE 20 continued R96V FAULT CODES WITH DESCRIPTIONS AND SOLUTIONS Diagnostics...
Page 123: ...123 FIGURE 62 2 STAGE ECM FURNACE WIRING DIAGRAM Troubleshooting...
Page 124: ...124 CM 1014...