background image

PTAC PHI Unit

INSTALLATION INSTRUCTIONS

Your kit contains the following:
• Mini Split unit with high voltage 230V ballast and 3’ leads                
• Instruction manual

NOTE: BE SURE MINI SPLIT UNIT IS UNPLUGGED AND POWER IS     

DISCONNECTED BEFORE PROCEEDING WITH INSTALLATION.

INSTALLATION & ELECTRICAL INSTRUCTIONS:

1. 

Remove plastic tapes from velcro tabs and position Mini Split unit over in-

take of indoor air unit. Press firmly to attach adhesive tab to unit. (Refer to
Fig.3)  

CAUTION:  NEVER LOOK DIRECTLY AT AN ILLUMINATED PHI CELL.

THIS DEVICE PRODUCES GERMICIDAL UV LIGHT AND WILL CAUSE

DAMAGE TO EYES

Figure 3

Guardian Air REME HVAC Cell

REME or Re-

flective Electro Magnetic Energy utilizes an

electromagnetic energy cell to create ionized

hydro peroxides™, a friendly oxidizer plasma

made from oxygen and humidity. This air purify-

ing plasma is propelled into the HVAC duct or

plenum by a silent plasma propulsion module

that has no moving parts, yet propels the

plasma at 2 cfm. This provides for fan or blower-

less operation on a 24-hour basis. The purifying plasma will be propelled

through the ducts whether the fan or blower is on or not. 24 volt installation

lets the REME run 24/7 without wiring to the fan/blower circuit. The oxidizer

plasma transfers the electrical charge (positively and negatively charged ions)

from the hydro peroxides to suspended (airborne) particles in the occupied

space causing them to bond together. This makes them too heavy to float en-

abling them to be drawn back to the filter. This is an excellent solution for in-

divuals that suffer from dust and dander allergies.

RGF’s Guardian Air PHI

is designed to elimi-

nate sick building syndrome risks by reducing

odors, air pollutants, VOCs (chemical odors),

smoke, mold, bacteria and viruses*.  The HVAC-

PHI Cells are easily mounted into air condition-

ing and heating systems air ducts where most

sick building problems start.  When the HVAC

system is in operation the HVAC-PHI Cell cre-

ates an Advanced Oxidation Process consisting of: Hydro-peroxides, super

oxide ions and hydroxide ions. All are friendly oxidizers that revert back to

oxygen and hydrogen after the oxidation of the pollutant.

Additional RGF Products

In Duct Microbe, VOC and Allergen Solutions

Summary of Contents for Mini Split Units

Page 1: ...or Mini Split Units NOTE Please take time to read the attached assembly instructions All instructions and precautions should be adhered to while operating this system Manufactured in the USA by RGF Environmental Group Inc RGF Environmental Group Inc Copyright 2013 MINI SPLIT 6 2013 ...

Page 2: ..._____ INVOICE _____________________DISTRIBUTOR P O _________________ DATE OF SALE ________________OVER THE COUNTER EXCHANGE YES NO IF YES SERIAL _____________________________ ITEM S SUBMITTED FOR WARRANTY 1 __________________________________________________________________________ 2 __________________________________________________________________________ REASON S FOR RETURN _____________________...

Page 3: ...e Mini Split PHI Cell easily mounts onto existing Mini Split air conditioning heating and heat pump units When the Mini Split system is in operation the PHI Cell uses an Advanced Oxidation Process to reduce airborne contaminants Ballast Proprietary UVX Long life lamp PHI Cell Features Figure 2 Incoming air containing bacteria mold smoke virus and VOCs Typical Installation Purified air distributed ...

Page 4: ...ion on a 24 hour basis The purifying plasma will be propelled through the ducts whether the fan or blower is on or not 24 volt installation lets the REME run 24 7 without wiring to the fan blower circuit The oxidizer plasma transfers the electrical charge positively and negatively charged ions from the hydro peroxides to suspended airborne particles in the occupied space causing them to bond toget...

Page 5: ...r s obligation under this warranty is limited to repairing or replacing any part found to its satisfaction to be so defective The manufacturer at its dis cretion may replace exchange the defective unit up to 90 days from the date of purchase Hereafter it will need to be returned under a Returned Materials Authorization RMA for review and or repair if found defective This warranty does not cover pa...

Page 6: ...Manufacturer However your supplier will process the claim with the other manufacturer Steps to take when you have determined that your equipment is mal functioning within the warranty period Call your contractor or distributor and notify them of the problem or malfunction It may be a simple problem or oversight with a simple solution If it is determined that a part is malfunctioning due to a defec...

Reviews: