INSTALLATION—CONTINUED
Duct Connections—Continued
Ductwork Requirements—Continued
• Supply air duct/furnace horizontal connection:
the seal between the furnace and the duct must be mechanical .
The connection should be made using U-type flanges on the top and bottom of the connecting duct . Slide the duct
over the flanges of the heater to provide an airtight fit . Provide U-channels for the other side flanges to ensure
tight joints . Use sheet metal screws to fasten ducts and U-channels to the furnace flange (refer to
section) .
• Connection dimensions:
connection dimensions (inches (mm)) are shown in
.
Figure 21. Ductwork Connection Dimensions (Refer to
Table 16. Ductwork Connection Dimensions
Unit Size
Dimension G
*
Inches
Millimeters
075, 100
12-1/2
318
125, 140
15-1/4
387
170
18
457
200
20-3/4
527
225
23-1/2
597
250
26-1/4
641
300
31-3/4
806
350
37-1/4
946
400
42-3/4
1086
*
Refer to
.