6.
Repeat to assemble another floor section.
Step 1
Assemble Floor
3. Remove the (2) two loose 2x4 floor joists.
4. Install (3) three 87" long treated floor joists, between the 48" long boards.
Use 16d galv. deck nails.
5. Install an OSB flooring panel over the floor frame. Use 8d spiral deck nails,
space nails 12" apart.
1. After removing all material from the pallet/floor, turn the pallet over.
2. Remove the 2x4-4'shipping cleats.
2x4-87" Floor joist
2x4-48" Board
5/8" Flooring