8
1
2
3
10
9
7
6
5
GAS
INTAKE
DOMESTIC
HOT WATER
WATER
INTAKE
CH
RETURN
CH FLOW
OPERATING DIAGRAM
ELECTRICAL WIRING DIAGRAM
INSTALLATION
1) Primary heat exchanger
2) Burner
3) Gas valve
5) Safety valve
6) Filling loop cock
7) Hot water priority turbine
9) Circulator unit
10) Expansion tank
Pict. 8
Pict. 9
GND
SIGN
+5VDC
FLUX
VG MODULA
TOR
D.H.W
. PROBE
HEA
TING PROBE
SAFETY
THERMOST
AT
LINE POWER
NEUTRAL POWER
EARTHING
BOILER
EARTHING
L
N
IGNIT
OR
EARTHING
OPEN THERM
ROOM THERMOSTAT
W
ATER PRESSURE SWITCH
AIR PRESS. SWITCH
NEUTRAL
FASE
GAS VALVE
FAN LINE
FAN NEUTRAL
CIRC.R NEUTRAL
CIRC. LINE
NEUTRAL FASE
Summary of Contents for ISA 20 BITHERMAL
Page 2: ......
Page 3: ...ISA 20 KW BITHERMAL BOILER MANUAL VERS 07 2016 REV 1 ...
Page 33: ...NOTE ...
Page 34: ...NOTE ...
Page 35: ......