heavy dust.
4. The power connection position maybe located at 
different side, so be sure to do grounding protec-
tion before use.
5. Always ensure top cover is open before turning 
the power on. Start the machine by pressing the 
top cover and the process start automatically. For 
3-phase vacuum machinery, please be sure the 
vacuum pump is running in correct direction. If the 

direction is wrong, simply switch the phase of the 
power.
6. Preheat of vacuum pump must be done in low 
temperature working area. Turn off the heater se-
lection switch at the control panel to off postion. 
This is to prvent heating process and cut down 
wear and tear losses. Run the vacuum pump a few 
time and machine will be ready to use.

Setting

Please set every parameter firstly before starting machine.

7. Turn on the power supply, check through the 
setting shows on the panel and make sure “-----
“ must be shown after setting is done. Otherwise, 
operation of this machine cannot be function if the 
setting is not on this mode.
8. Press the setting button, the indicator lamp of 
vacuum lights to enter into the setting state of vac-
uum timing. Press the upward or downward key to 
increase or decrease vacuum time in the range of 

0-99 seconds. 
9. After the vacuum time is set, press the set key 
and the nitrogen filling indicator lamp lights to en-
ter into the setting state of nitrogen filling. Press 
the upward or downward key to increase or de-
crease nitrogen filling time in the range of 0-99 
seconds.

Note: Some models of our machine do not have nitrogen filling function, so after 

setting the vacuum time, it enter sealing time directly.

10. Press the parameter set key, heating indica-
tor lamp lights to enter into heating setting state. 
Press the upward or downward key to increase or 
decrease the heating sealing time in the range of 
0-35 seconds. The time setting should be from low 
timing and gradually to higher timings.
11. After the heating time is set, press the set key 
again, cooling indicator lamp lights to enter into 
the setting state of cooling time in the range of 
0-99 seconds.
12. After the heating time is set, press the set key 
again to finish the parameter setting, and “Ed” is 
shown in panel.
13. Press the “temperature selection” set key to 
enter into temperature set state. Press the set 

key once, indicate one corresponding temperature 
value, and the lamp shows orange color; there 
are three selections such as “high temperature”, 
“middle temperature” and “low temperature”. For 
a special reqruiement, pelase contact the equip-
ment manufacuturer.
14. Remarks & Tips: Ways to fast process of vacu-
um a small item or product using a bigger cham-
ber is to place a solid block into the chamber as to 
occupy the chamber space so as to allow less vacu-
um time needed due to compact space. You can buy 
the PP board as solid block from us.
15. IMPORTANT: *** DO NOT BLOCK THE AIR 
HOLE IN THE CHAMBER***.

Summary of Contents for 201459

Page 1: ...manual carefully before using the appliance Przed uruchomieniem urz dzenia nale y koniecznie dok adnie przeczyta niniejsz instrukcj obs ugi Item 201459 VACUUM PACKAGING MACHINE PAKOWARKA PR NIOWA User...

Page 2: ...Keep this manual with the appliance Zachowaj instrukcj urz dzenia For indoor use only Do u ytku wewn trz pomieszcze 2 EN...

Page 3: ...electric shock Do not attempt to repair the appliance yourself In case of malfunctions repairs are to be conducted by qualified personnel only Never use a damaged appliance Disconnect the appliance f...

Page 4: ...nd its cord out of reach of children Always disconnect the appliance from the mains if it is left unattended or is not in use and before assembly disassembly or cleaning Never leave the appliance unat...

Page 5: ...N BEFORE USE Installation 1 Before operation please read through the In struction Manual about each operation rules and the safety precaution 2 You must fill the vacuum pump with NO 68 or NO 100 vacuu...

Page 6: ...tting state of nitrogen filling Press the upward or downward key to increase or de crease nitrogen filling time in the range of 0 99 seconds Note Some models of our machine do not have nitrogen fillin...

Page 7: ...esn t act when cooling the panel shows till the re verse timing is finished air is returned the cover opens automatically and the whole processing is finished Then prepare the next cycle 10 Press the...

Page 8: ...ncluding plastic frame 7 Sealing Transformer 8 Working Transformer 9 Relay 10 AC Contactor 11 Gas Flushing Valve 12 Plug Board 13 Gas Flushing Port 14 Fan 15 Lid Vacuum Pump Oil Filling Sketch Unpack...

Page 9: ...pring 11 Lid switch 12 Hinge Sealing Tape and Heating Wire Replacement Sketch 1 Disconnect the cable from the pin then pick the complete sealing bar up from the vacuum chamber 2 Remove the pressing st...

Page 10: ...cing screws from the two sides of sealing bar by Allen key then take out the heating wire The above disassembly steps are finished introduce the installation as bellow 5 Put one side of a new heating...

Page 11: ...wire by the special tool 8 Take a sealing tape at proper length and sticker it on the heating wire 9 Cut the remaining sealing tape on the two sides enable to fold it 10 Put plastic parts on the two...

Page 12: ...ning foils 2 How much longer will my products last Typically shelf life may be extended three to five times Results will vary though depending on the nature of the product cleanliness handling tem per...

Page 13: ...of fering here We offer single and double chamber machines equipped with single and double seal bars nd dif ferent chamber volumes as well as fully automat ic machines designed to cover the most rigo...

Page 14: ...hort or temperature is too low Sealing can t be pressed tightly caused by insuf ficient bulge of gas bag Air bubble shrinks caused by insufficient cooling time Heating sealing bar is damaged and the s...

Page 15: ...maintained in accordance with the instructions and has not been abused or misused in any way Your statutory rights are not affected If the appli ance is claimed under warranty state where and when it...

Page 16: ...ie obudowy urz dzenia Nie wtykaj adnych przedmiot w w obudow urz dzenia Nie dotykaj wtyczki kabla zasilaj cego wilgotnymi r kami Ryzyko pora enia pr dem Regularnie kontroluj stan wtyczki i kabla W prz...

Page 17: ...liczce znamionowej Unikaj przeci enia Po u yciu wy cz urz dzenie wyjmuj c wtyczk z gniazda Instalacja elektryczna musi odpowiada krajowym i lokalnym przepisom Z urz dzenia nie mog korzysta osoby tak e...

Page 18: ...cji awaryjnej podczas pracy urz dzenie zatrzymuje wszystkie pro cesy a po naci ni ciu przycisku wy czenia awaryjnego otwiera pokryw komory pr nio wej Po naci ni ciu przycisku wy czenia awaryjnego 3 4...

Page 19: ...ego przed u yciem nale y wykona uz iemienie 5 Przed za czeniem urz dzenia nale y zawsze upewni si e pokrywa g rna jest otwar ta Urz dzenie za cza si naciskaj c pokryw g rn proces rozpocznie si automat...

Page 20: ...w zakresie od 0 do 99 sekundy 12 Po ustawieniu czasu nagrzewania ponownie nacisn przycisk ustawie aby zako czy proces ustawiania parametr w na panelu wy wietli si symbol Ed 13 Nacisn przycisk wyboru...

Page 21: ...owywane jest powietrze pokrywa automatycznie si otwiera a ca y proces jest w wczas zako czony Mo na ter az przygotowa kolejny cykl 10 W razie zaistnienia podczas pracy sytuac ji awaryjnej nale y nacis...

Page 22: ...amk 7 Transformator listwy zgrzewaj cej 8 Transformator pracy 9 Przeka nik 10 Stycznik AC 11 Zaw r gazu 12 P yta przy czeniowa 13 Port gazu 14 Wentylator 15 Pokrywka Schemat nape niania olejem pompy p...

Page 23: ...elka 9 Pokrywa akrylowa 10 Spr yna naciskowa 11 Prze cznik pokrywy 12 Zawias Schemat wymiany listwy zgrzewj cej i przewodu grzewczego 1 Od czy kabel od wtyku nast pnie wyj ca listw uszczelniaj c z kom...

Page 24: ...ury ta m pokryt teflonem 4 Kluczem imbusowym wykr ci ruby naciskowe umieszczone po obu stronach listwy uszczelniaj cej nas t pnie wyj przew d grzewczy Opisany wy ej proces monta u jest zako czony tera...

Page 25: ...t pnie odci pozosta cz przewodu specjalnym narz dzi em 8 Wzi odpowiedniej d ugo ci ta m uszczelniaj c i przyklei j do przewodu grzewczego 9 Odci pozosta o ta my uszczelniaj cej po obu stronach tak aby...

Page 26: ...b worki laminowane Tak jest ono przystosowane do zgrzewania odd zielnych warstw w tym warstw zawieraj cych folie 2 Przez jaki czas produkt b dzie mi s u y Zwykle jego okres eksploatacji wynosi od trze...

Page 27: ...r tsz trwa o ci Urz dzenie dostarczane jest wraz z zestawem cz ci zamiennych lecz na le y zawsze kontrolowa ile z tych cz ci mamy jeszcze w zapasie 8 Czy w przypadku pakowania pr niowego pro dukt w sp...

Page 28: ...y przewentylowa i nagrza Usterka silnika pompy pr niowej lub jej zaworu elektromagnetycznego albo zu ycie na skutek u ytkowania Wymieni cz ci lub skontaktowa si z produ centem Awaria uk adu grzewczeg...

Page 29: ...na odpady Zu yte urz dzenia elektryczne i elektronicznie mog zawiera niebezpieczne sk adniki np rt o w kadm lub freon Je li tego typu substancje przedostan si w spos b niekontrolowany do ro dowiska s...

Page 30: ...23 G dki Poland Tel 48 61 6587000 Fax 48 61 6587001 Email info hendi pl Changes printing and typesetting errors reserved Producent zastrzega sobie prawo do zmian oraz b d w drukarskich w instrukcji 20...

Reviews: