
9
INSTALLATION, CONT’D: MAIN POWER SWITCH / TOE-KICK & AIR INTAKE GRILLE / PLUG-IN
9. Plug Case In / Turn Main Power Switch On
Power cord with plug is factory-supplied.
Plug case into customer-supplied electrical outlet.
Note 1: Partially-disassembled view at right is
shown with casters removed for illustrative
purposes only. View/location of floor receptacle
is for illustrative purposes only.
Note 2: Due to space constraints, it may be
necessary to pull out condenser package to
maneuver power cord plug around components
and into receptacle.
Turn main power switch on.
Check that case is energized. Lift deck pans
to confirm that evaporator fans are rotating.
Turn on LED light switch (located on rear-right
upright cover). See
CASE DESIGN, CONT
’
D:
LED LIGHT SWITCH LOCATION
section in
this operating manual for illustration.
10. Toe-Kick To Case
After case has been fully assembled and is in
position, return toe-kick to case.
Toe-kick is held in place by magnets only.
No screw replacement is required.
11. Return Air Intake Grille To Case
After case has been energized and main power
switch has been turned on, return air intake
grille to case.
Air intake grille is held in place by magnets.
Screw replacement is not required.
See illustration below.
Front Toe-Kick
Air Intake Grille
Factory-Supplied
Power Cord
With Plug
Main Power
Switch
Note: Shipping Brace That Is At Air
Intake Side of Condenser Package
(Shown) Must Be Removed!
Air Intake Grille
Main Power
Switch