
INSTALLATION INSTRUCTIONS:
5PD SERIES PULL DOWN
12400 Earl Jones Way
Louisville, KY 40299
rev-a-shelf.com
Customer Service:
800-626-1126
5PD PREMIERE PULL-DOWN SHELVING SYSTEM
TOOLS REQUIRED:
45 MIN
ESTIMATED ASSEMBLY TIME:
CARE AND MAINTENANCE:
Clean with a damp cloth
and wipe parts dry. Keep all
chemicals away from gas
spring piston rod.
I-5PD-0219
3
32
1
4
1
4
#2
#2
(2mm)
(6mm)
Parts List
No.
Description
Qty
A
Left Base Bracket
1
B
Right Base Bracket
1
C
Left Side Frame
1
D
Right Side Frame
1
E
Handle
1
F
Wire Baskets or Solid Baskets
2
G
Synchronizer Bar
1
Fittings
No.
Description
Qty
1
1/4” x 1-1/4” Bolts
4
2
Cap Nuts
4
3
Washers
4
4
M5 x 12 mm Pan-head Screws
6
5
Wood Screws
16
6
M4 x 6 mm Screws
6
7
M5 x 12 mm Flat Head Screws
4
8
Logo Covers
2
C.
1.
6.
7.
8.
9.
2.
3.
4.
5.
A.
B.
D.
E.
F.
G.