![RESU RESU10H Manual Download Page 17](http://html1.mh-extra.com/html/resu/resu10h/resu10h_manual_1445539017.webp)
3.1.4 Clearance
300mm
(12")
Floor
300mm
(12")
600mm
(24")
300mm
(12")
• Recommended clearances for the left,
right, top and bottom of the product
is shown in the figure for the proper
ventilation and installer convenience.
3.1.5 Tools & safety gears required
•
Tools
The f
ollo
wing tools are required to install the batte
r
y pack :
Precision scr
e
wdri
ver
M6
Tor
que wrench
Inclinometer
Drill
(Min. Diameter 10mm, 0.4")
P
encil or Ma
r
k
er
In
stallation
17