© RESOL 11294 flo
wsol_d_d_he
.monen.ind
d
FlowSol D / D HE
5 |
2. Mounting the station
0,0
1,0
2,0
3,0
4,0
5,0
6,0
7,0
8,0
9,0
10,0
0
200
400
600
800
1000
1200
0
9,8
19,6
29,4
39,2
49
58,8
68,6
78,4
88,2
98
FlowCon D / D HE
Grundfos Solar PM 15-85
Wilo ST 15/6
Pump characteristic / pressure loss characteristic
FlowSol
D / D HE
pr
essur
e [m head]
flow rate [l/h]
pr
essur
e loss [kPa]
Î
Determine the mouting site of the station.
Î
Take the station out of the packing. Remove the front
half of the insulation by pulling it backwards.
Î
Hold the enclosed wall mounting bracket against the
wall and mark the fastening holes, drill holes and insert
dowels
Î
Fasten the wall mounting bracket to the wall with the
screws.
Î
Push the station against the wall mounting bracket. The
station catches and is then attached to to the wall.
Î
Connect the station to the solar thermal system.
Î
Check the inlet pressure of the expansion vessel
and, if necessary, adjust it to the local conditions
(P inlet [bar] = 1 bar +
D
Th [m]*1/10 (
D
Th = height
difference between collector and station)
Î
Connect the electrical components of the solar station:
Attach the store and collector sensor and connect these
to the controller. Plug the controller into a socket.
Î
Tighten all union nuts and screw connections.
Î
Attach the front half of the insulation to the station.