background image

Operation Manual

" T h e   G l o b a l   L e a d e r   i n   i n t r i n s i c a l l y   s a f e   l i n e - t h r ow i n g   e q u i p m e n t "

TM

the NEW Generation

R

ESC

UE

 

S

OLUTION

S

 

    

INC

I

NTERNATIONA

L

Summary of Contents for ResQmax

Page 1: ...Operation Manual The Global Leader in intrinsically safe line throwing equipment TM the NEW Generation R E S CUESOLUTI O N S INC I N TERNATION A L...

Page 2: ...any other aspect of this equipment call Rescue Solutions International Inc directly at 800 709 5018 or 760 727 8998 or by email at mail rescueinternational com Note See Disclaimer page 35 for an Impo...

Page 3: ...in for service this record must be included Date of Purchase ResQmax Serial Projectile Serial Expiration Date Projectile Serial Expiration Date Projectile Serial Expiration Date Projectile Serial Expi...

Page 4: ...tried to fire the launcher without disengaging the safety I then tried to disengage the safety but it seems jammed When you prepare to fire the launcher the mechanism is under pressure If you apply st...

Page 5: ...injuries or death CAUTION If projectiles are subjected to extreme heat the pressure could rise sufficiently to rupture the Pressure Relief Assy and allow the air to escape preventing use of the equipm...

Page 6: ...appliance fuled by compressed air specifically designed to deploy a line only or a grappling hook and line a grappling hook and ascending ladder to an otherwise inaccessible point in both land based...

Page 7: ...ing actions Provide adequate and frequent training in the operation of this equipment in actual field conditions Implement and maintain a program for the regular review of the equipment to insure that...

Page 8: ...Relief Assy 7 Place the O Ring around the threaded end of the Nozzle and screw the assembly back into the projectile cylinder Figure 23c Reinstalling the Nozzle Valve Plug Replacement of the Nozzle P...

Page 9: ...erformance Important Note The beveled surface of the neck of the nozzle is subject to wear at the moment of launching In normal conditions this part is suitable for 150 or more discharges Carefully in...

Page 10: ...ere is an O ring on the projectile nozzle which is re usable unless damaged A replacement O ring is included Do NOT use any sealant or tape on the thread of the nozzle Apply a small amount of Corrosio...

Page 11: ...e care must be taken by the operator to avoid being struck by the Line and Hook during its downward descent Note Adequate training in all aspects of the use of this equipment is essential in order to...

Page 12: ...t will be necessary to top it up using the procedure as described on page 11 This is also a good opportunity to have a practice launch Note If the Pressure Gauge on the Launcher does not show 0 pressu...

Page 13: ...ok and install the projectile with Grappling Hook into the launcher The launcher is then ready for discharge following the steps outlined on page 26 for vertical deployment of the Grappling Hook Figur...

Page 14: ...to the neck of the Projectile cylinder with velcro strap provided and return the Line to the blunt end of the projectile along the opposite side of the cylinder 6 Press the Safety Push Knob to insure...

Page 15: ...the line container door closed V Groove Bridle Lines Quick connect Figure 17a Figure 17b Protecting the Cylinder or Projectile All practice deployments SHOULD BE INTOWATER The projectile is primarily...

Page 16: ...on the line Note DO NOT coil or loop the line EVER If you coil the line you may build in tension that will cause snarls the next time you use it resulting in poor performance during deployment Figure...

Page 17: ...it to service See Fig 14b Note The main line and bridle lines should be inspected after each use for fraying or damage before storing for later use If immersed in seawater during use all lines and pro...

Page 18: ...projectile being inserted it is necessary to press the Safety Push Knob to release the safety internally prior to inserting another porjectile 19 Step 5 Step 4 Connecting the Launcher to the Line Cont...

Page 19: ...projectile being inserted it is necessary to press the Safety Push Knob to release the safety internally prior to inserting another porjectile 19 Step 5 Step 4 Connecting the Launcher to the Line Cont...

Page 20: ...it to service See Fig 14b Note The main line and bridle lines should be inspected after each use for fraying or damage before storing for later use If immersed in seawater during use all lines and pro...

Page 21: ...on the line Note DO NOT coil or loop the line EVER If you coil the line you may build in tension that will cause snarls the next time you use it resulting in poor performance during deployment Figure...

Page 22: ...the line container door closed V Groove Bridle Lines Quick connect Figure 17a Figure 17b Protecting the Cylinder or Projectile All practice deployments SHOULD BE INTOWATER The projectile is primarily...

Page 23: ...to the neck of the Projectile cylinder with velcro strap provided and return the Line to the blunt end of the projectile along the opposite side of the cylinder 6 Press the Safety Push Knob to insure...

Page 24: ...ok and install the projectile with Grappling Hook into the launcher The launcher is then ready for discharge following the steps outlined on page 26 for vertical deployment of the Grappling Hook Figur...

Page 25: ...t will be necessary to top it up using the procedure as described on page 12 This is also a good opportunity to have a practice launch Note If the Pressure Gauge on the Launcher does not show 0 pressu...

Page 26: ...e care must be taken by the operator to avoid being struck by the Line and Hook during its downward descent Note Adequate training in all aspects of the use of this equipment is essential in order to...

Page 27: ...ere is an O ring on the projectile nozzle which is re usable unless damaged A replacement O ring is included Do NOT use any sealant or tape on the thread of the nozzle Apply a small amount of Corrosio...

Page 28: ...erformance Important Note The beveled surface of the neck of the nozzle is subject to wear at the moment of launching In normal conditions this part is suitable for 150 or more discharges Carefully in...

Page 29: ...Relief Assy 7 Place the O Ring around the threaded end of the Nozzle and screw the assembly back into the projectile cylinder Figure 23c Reinstalling the Nozzle Valve Plug Replacement of the Nozzle P...

Page 30: ...ing actions Provide adequate and frequent training in the operation of this equipment in actual field conditions Implement and maintain a program for the regular review of the equipment to insure that...

Page 31: ...appliance fuled by compressed air specifically designed to deploy a line only or a grappling hook and line a grappling hook and ascending ladder to an otherwise inaccessible point in both land based...

Page 32: ...injuries or death CAUTION If projectiles are subjected to extreme heat the pressure could rise sufficiently to rupture the Pressure Relief Assy and allow the air to escape preventing use of the equipm...

Page 33: ...tried to fire the launcher without disengaging the safety I then tried to disengage the safety but it seems jammed When you prepare to fire the launcher the mechanism is under pressure If you apply st...

Page 34: ...in for service this record must be included Date of Purchase ResQmax Serial Projectile Serial Expiration Date Projectile Serial Expiration Date Projectile Serial Expiration Date Projectile Serial Expi...

Page 35: ...any other aspect of this equipment call Rescue Solutions International Inc directly at 800 709 5018 or 760 727 8998 or by email at mail rescueinternational com Note See Disclaimer page 35 for an Impo...

Page 36: ...w Body Cast In Inserts Fasteners Pressure Gauge Launcher Barrel Launcher Handle Line Container Cast In Inserts Fasteners Stock Body Cast In Inserts Fasteners Locking Slide Projectile Cylinder Projecti...

Reviews: