background image

Australia
Add:  18 Corporate Blvd. Bayswater, VIC 3153, Australia
      T: +61 481 251 275
      E: [email protected]  

APMEA & China
Add: F-15,Manpo Intl. No.500 WestYan’an Rd, Shanghai, China 200050
      T: +86 21 62809180
      E: [email protected]   

Web: www.renesola.com 
E: [email protected]

U.S.A 
Add: 301 Howard St, Suite 850, San Francisco, CA 94105.
     T: +1 415 852 7418
      E: [email protected]

Europe
Add: Renesola Deutschland GmbH, Lyoner Strasse 15, 60529 Frankfurt/M, Germany
     T: +49 69 663 786 9-0
      E: [email protected]

Instructions for 
the 

Micro Replus

 Gateway (MRG)

Summary of Contents for Micro Replus Gateway

Page 1: ...ai China 200050 T 86 21 62809180 E apmea renesola com Web www renesola com E inverter renesola com U S A Add 301 Howard St Suite 850 San Francisco CA 94105 T 1 415 852 7418 E america renesola com Europe Add Renesola Deutschland GmbH Lyoner Strasse 15 60529 Frankfurt M Germany T 49 69 663 786 9 0 E europe renesola com Instructions for the Micro Replus Gateway MRG ...

Page 2: ...ware interface introduction 2 2 Installation and setting guide 3 User interface introduction 3 1 Main System Interface 3 2 Interface Overview 3 3 Energy Functions 3 4 Settings 3 5 Backup Clear Date 3 6 Status Bars 3 7 Other Important Items and Procedures 4 Technical specifications 01 01 02 03 03 03 05 05 06 06 08 09 10 11 11 ...

Page 3: ...1 System connection diagram 1 1 Single phase wiring diagram 01 Figure 1 1 Single phase wiring diagram ...

Page 4: ...inutes and the main interface will be showed and then click the rightmost setting button to enter the setting interface Figure 2 1 Hardware interface introduction Figure 2 2 1 Connect Ethernet and Power Cables Figure 1 2 Single phase wiring diagram 2 Installation Three phase output must be installed a MRG on each phase otherwise could not detect the data of mirco inverters a b c a Plug the Etherne...

Page 5: ...erter operates normally the power data will be displayed The MRG takes approximately 1 2 minutes to start up after power has been turned on After start up the system will enter the main interface shown in Fig 3 1 all three numbers will read 0 at start up Fig 2 shows the MRG main interface The main interface is arranged in three horizontal rows which consist of the tool bar at the very top the disp...

Page 6: ...wing power generation over each year for the past 20 years see Fig 3 7 This display is also very similar to the Last 7 Days Energy display Here the horizontal coordinates represent the year the years 2011 2010 are shown from left to right and the vertical coordinates represent the amount of power generated kWh The green bars indicate the amount of power generated over each year The absence of a gr...

Page 7: ...ta This is limited to power generation data device settings will not be changed 3 5 Backup Clear Date 08 09 The communications address settings tab Fig 3 10 is used to set the powerline carrier communications address of the micro inverter linked to the device Settings can be input using either the small input panel on the touch screen or an external USB keyboard You can find a bar code sticker at t...

Page 8: ...ically using DHCP first insert the network cable and select DHCP on the Ethernet settings page this works only when there is a DHCP server on the network After confirming the changes restart the device if successful the IP address that has been automatically obtained will be displayed in the status bar If you wish to use a USB keyboard for input plug the keyboard s USB cable into the device s USB po...

Reviews: