Before inverter operation, it’s required to set up “Operation
Mode” via software. Please strictly follow below steps to set up.
For more details, please check software manual.
Step 1:
After turning on the inverter and installing the software,
please click “Open Monitor” to enter main screen of this
software.
Step 2:
Log in into software first by entering default password
“administrator”.
Step 3: Select Device Control>>MyPower Management. It is to
set up inverter operation mode and personalized interface.
Refer to diagram below.
Mode
There are three operation modes: Grid-tie with backup,
Grid-Tie and Off-Grid.
Grid-tie with backup: PV power can feed-in back to grid,
provide power to the load and charge battery. There are four
options available in this mode: Grid-tie with backup I, II, III, IV
and V. In this mode, users can configure PV power supply
priority, charging source priority and load supply source
priority. However, when Grid-tie with backup IV option is
selected in PV energy supply priority, the inverter is only
operated between two working logics based on defined peak
time and off-peak time of electricity. Only peak time and
off-peak time of electricity are able to be set up for
optimized electricity usage.
Grid-Tie: PV power only can feed-in back to grid.
Off-Grid: PV power only provides power to the load and
charge battery. No feed-in back to the grid is allowed.
SECTION A:
Standard:
It will list local grid standard. It’s requested to have
factory password to make any modifications. Please check local
dealer only when this standard change is requested.
CAUTION:
Incorrect settings could cause the unit damage or not
working.
SECTION B:
This section contents may be different based on different
selected types of operations.
When battery voltage <xx.x V. the AC starts charging: When
selected, once the battery voltage is lower than the setting (xx.x
V), AC will start to charge battery. When this condition is
selected, it’s allowed to enter setting voltage. Otherwise, it’s
impossible to enter any values.
AC charging duration: This is the time of day that AC (grid) is
allowed to charge battery. When the duration is set up as
0:00-00:00, there is no time limitation for AC to charge battery.
AC output ON/Off Timer: Set up on/off time for AC output of
inverter. If setting it as 00:00/00:00, this function is disabled.
Nominal Output Voltage: There are 5 options for high voltage
system to select, 240V, 230V, 220V, 208V and 202V.
Nominal Output Frequency: There are two options to select,
50HZ or 60HZ.