
6
3
Remove white/clear backing tape
and stick to underside of scale.
4
Throughly mix and apply epoxy then remove
green backing tape and stick to substrate.
Area for RGG-2 epoxy (A-9531-0342)
Support
dowels
Mounting ledge
7
Remove excess epoxy
Allow 24 hours for epoxy to cure fully, then clean
scale using Renishaw scle wipes (A-9523-4040)
or a clean, dry, lint-free cloth.
Adhesive mounting installation
2
Mark area for epoxy on adhesive tape.
1
RGH40 RGS40-G
installation guide
5
5
Locate scale against dowels or ledge and
rotate down onto substrate. Press down
with firm finger pressure
8
Clean underside of glass scale using approved solvents
(see ‘Storage and handling’).
Throughly clean and degrease
the substrate with
a lint-free cloth.