LE6XRT ERV
17
1.800.627.4499
INSTALLATION, OPERATION AND MAINTENANCE MANUAL
RENEWAIRE.COM
SHIPPING / RECEIVING
4.0 SHIPPING / RECEIVING / HANDLING
All ERVs are palletized and then shipped by common carrier. It is the installer’s / customer’s responsibility
to coordinate delivery and properly handle the shipment during unloading and storage. RenewAire also
provides a manual for shipping, rigging, lifting and assembly of LE units that is available online at
www.
renewaire.com.
4.1 UNIT WEIGHTS / DIMENSIONS
4.2 RECEIVING
4.3 RIGGING
4.4 HANDLING AND STORAGE
For unit dimensions and weight, see the RenewAire product submittal. Also
see sections 3.3 and 3.4
Corner Weights
in this manual.
For unit shipping dimensions and weight, see the RenewAire product submittal. Also
see sections 3.3
and 3.4 Corner Weights
in this manual.
4.1.1 Unit Dimensions and Weight
4.1.2 Shipping Dimensions and Weight
Upon delivery of the ERV, inspect it carefully for shipping damage and completeness. Verify the pres-
ence of any accessories such as external hoods that are to be field-installed or filters that are shipped
loose. If shipping damage is discovered, take digital pictures and note the visible damage on the ship-
ping manifest. Notify your RenewAire dealer immediately.
For rigging instructions, refer to the LE manual for shipping, rigging, lifting and assembly that is also
available online at
www.renewaire.com
.
ERVs that are delivered to a job site should ideally be placed and installed immediately. If the ERV
cannot be installed immediately, the unit should be protected from the weather, either by moving it
indoors or by covering with tarps. When placing the ERV on the ground, the placement area should be
flat and level. Take care to avoid twisting or wracking of the unit.