![RenewAire LE10XIN Installation, Operation & Maintenance Manual Download Page 4](http://html1.mh-extra.com/html/renewaire/le10xin/le10xin_installation-operation-and-maintenance-manual_1441007004.webp)
LE10XIN ERV
RENEWAIRE.COM
INSTALLATION, OPERATION AND MAINTENANCE MANUAL
1.800.627.4499
4
TABLE OF CONTENTS
IMPORTANT SAFETY INFORMATION
2
UNIT INFORMATION
3
CONFIGURATION CODE FOR LE10XIN MODELS
6
LE10XINH SUBMITTAL SPECIFICATIONS
7
LE10XINH DIMENSIONS
8
LE10XINV SUBMITTAL SPECIFICATIONS
9
LE10XINV DIMENSIONS
10
1.0 OVERVIEW
11
1.1 DESCRIPTION
11
1.2 FACTORY ASSEMBLY OF MODULES
11
1.3 MODELS
11
1.3.1 LE10XINH
11
1.3.2 LE10XINV
12
2.0 COMPONENT DESCRIPTION
13
2.1 CABINET CONSTRUCTION
13
2.1.1 Cabinet Paint
13
2.2 FAN MOTORS
13
2.3 FAN SPEED CONTROL
13
2.4 DAMPERS
13
2.5 ENTHALPIC CORE
13
2.6 FILTERS
13
2.6.1 Filter Monitors
13
2.7 CONTROLS
14
2.7.1 Integrated Microprocessor Controls
14
2.7.2 Variable Frequency Drive
15
2.8 OPTIONAL CONTROL ACCESSORIES
15
2.8.1 Carbon Dioxide Control
15
2.8.2 Digital Time Clock
15
2.8.3 Indoor Air Quality Sensor (IAQ)
16
2.8.4 Motion Occupancy Control
16
2.8.5 Smoke Detector
16
3.0 UNIT WEIGHTS
17
3.1 LE10XINH CORNER WEIGHTS
17
3.2 LE10XINV CORNER WEIGHTS
17
4.0 SHIPPING / RECEIVING / HANDLING
18
4.1 UNIT WEIGHTS / DIMENSIONS
18
4.1.1 Unit Dimensions and Weight
18
4.1.2 Shipping Dimensions and Weight
18
4.2 RECEIVING
18
4.3 RIGGING
18
4.4 HANDLING AND STORAGE
18
5.0 UNIT PLACEMENT
19
5.1 SOUND ATTENUATION OUTSIDE THE BUILDING
19
5.2 PLACEMENT CAUTIONS
19
5.3 SERVICE CLEARANCES
19
6.0 INSTALLATION
20
6.1 ASSEMBLY OF MODULES
20
6.2 DUCT CONNECTIONS
20
6.3 INDOOR SOUND ATTENUATION
20
6.4 ELECTRICAL CONNECTIONS
21
6.4.1 Factory-Recommended Electric Service Entry
21
6.5 WIRING SCHEMATICS
22
6.6 CONTROL CONNECTIONS
24
7.0 CONTROL CONTRACTOR INFORMATION
24
7.1 24 VAC CLASS II POWER SUPPLY
24
7.2 MOTOR PROTECTION
25
7.2.1 Units Equipped with Motor Starters
25
7.2.2 Units With Variable Frequency Drives (VFDs)
26
7.3 EXTERNAL CONTROL CONNECTIONS
26
7.3.1 Single 2 - Wire Control, Unpowered
26
7.3.2 Single 2 - Wire Control, Separate Power
27
7.3.3 Control Sending 24 VAC “ON” Signal
27
7.3.4 External Control Using ERV Power Supply
27
7.3.5 Control with 2 Non-Powered Relay Contacts
27
7.3.6 Control with 2 “ON” Signals, External Power
28
7.4 SEQUENCE OF OPERATION
28
8.0 PRE START-UP
30
8.1 VERIFY VOLTAGES
30
8.2 VERIFY TRANSFORMER WIRING
30
8.3 INSPECT FILTERS
30
8.4 INSPECT FOAM GASKETING
30
8.5 INSPECT MOTOR VIBRATION ISOLATORS
30
8.6 INSPECT BELTS AND VERIFY SHEAVE ALIGNMENT
30
8.7 INSPECT FAN
30
8.8 INSPECT AND CLEAN THE INTERIOR
30
8.9 INSPECT DUCTWORK CONNECTIONS
30
9.0 START-UP
31
9.1 VERIFY CORRECT FAN ROTATION DIRECTION
31
9.2 BASIC OPERATIONAL CHECK
31
9.2.1 Motor Starter Units
31
9.2.2 VFD Units
31
9.3 ADJUST MOTOR SHEAVES
32
10.0 MAINTENANCE
32
10.1 MAINTENANCE 24 HRS. AFTER START-UP
32
10.2 MAINTENANCE 30 DAYS AFTER START-UP
32
10.3 MAINTENANCE SCHEDULE
32
10.4 FILTERS
32
10.5 ELECTRIC MOTOR MAINTENANCE
33
10.5.1 Belt Tension
33
10.5.2 Sheave Condition
33
10.5.3 Motor Cleanliness
33
10.5.4 Motor Lubrication
33
10.6 PILLOW BLOCKS
35
10.7 ENTHALPIC CORE MAINTENANCE
36
10.7.1 Removal of Enthalpic Cores
36
10.7.2 Reinstallation of Enthalpic Cores
36
10.8 SERVICE PARTS
37
11.0 MAINTENANCE REFERENCE
38
11.1 PLENUM DIVIDERS
38
11.2 FAN / MOTOR REMOVAL
38
11.3 VIBRATION ISOLATOR ADJUSTMENT
38
11.4 RISK OF CORE DAMAGE
39
11.5 FILTER REPLACEMENT PRACTICES
39
11.6 DOOR LATCH ADJUSTMENT
40
11.7 MEASURING AIRFLOW
40
11.8 SHEAVE ADJUSTMENT
41