background image

RTE7701201CFK144T000R

 

User’s Manual 

R20UT3176EJ0100  Rev. 1.00 

 

Page 2 of 5 

Sep. 05, 2014 

 

5. Connection Procedure (See Figure 3) 

 

The procedure for connecting the RTE7701201CFK144T000R is shown below. 
 

(1) Mount the TC on the target system. 
 

(a)

 

Thinly apply a two-part curing-type epoxy-based adhesive (with curing 

taking at least thirty minutes) to the tips of the four protrusions from the bottom 
surface of the TC to be bonded to the target system (before using the adhesive, 
use alcohol or another suitable solvent to clean the surface of the target system). 
If you have difficulty aligning the positions of the leads of the TC with the pads 
on the target system, adopt the method described in (b) below. 

 

(b)

 

Use guide pins (NQ guide) to align positions attached to the TC by 

inserting the pins into the sockets for this purpose on the top of the TC. 
These are two or three non-through holes with a diameter of 1.0 mm. 
Refer to the drawings of your TC for more information on the socket positions. 

 

(c)

 

Solder the TC to the target system. If an MA is to be included, attach the 

MA before soldering the TC. The MA is used to prevent scattered flux or solder 
creating problems by becoming attached to the contact pins of the TC. 

 

 

Conditions for soldering 

 

Reflow: within 10 seconds at 260

°

 

Manual soldering: within 5 seconds at 350

°

C (per pin) 

Cautionary note: Do not wash the flux away by immersion or 

vapor treatment. 

 

(d)

 

Remove the guide pins or MA if they were used. 

 

(2) Attach the EC to the TC. 
Attach the EC above the TC after confirming there are neither cracks nor bends 
on the contact pins of the EC. 
 

(3) Secure the four corners of the EC with the YQ guide screws that came 

with the EC. 
 

 

Screws supplied with the EC 

 
Use the flathead screwdriver or torque driver supplied with the 
EC to secure, in order, the screws at the four corners. The 
tightening torque of a YQ guide should be no more than 0.054 
Nm. Securing the screws too tightly will lead to faulty 
connections. 

(4) Attach the pod to the RTE7701201CFK144T000R. 

(5) Attach the RTE7701201CFK144T000R to the EC. 
 

 Adjusting the height of the socket 

The height of the socket is adjustable by inserting an SA between  
the EC and the RTE7701201CFK144T000R. 

 

 

 

 

 

 

 
 
 

(1)

(2)

(3)

(5)

Use the flathead screwdriver

 in the figure indicates an example of the location of the pin that 

governs alignment. Be sure to align the pin one positions of the pad 
pattern on the board and the other parts.

R

ENESAS

RTE

7701202

EPAxR

(4)

YQ guides (four)

EC

TC

SA

 

Figure 3   Procedure for Connecting the 

RTE7701201CFK144T000R 

Pod for RTE7701202EPA00000J (sold separately) 

RTE7701201CFK144T000R 

 

144-pin 0.5-mm-pitch 
(PLQP0144KA-A) pad patterns 
 

SA: Space adapter (sold separately, product of Renesas Electronics 
Corporation) 

Model Name: QB-144GJ-YS-01T 

EC: Emulator connector (sold separately, product of Renesas Electronics 
Corporation) 

Model name: QB-144GJ-YQ-01T 
*The QB-144GJ-YQ-01T package includes the YQ guides. 

TC: Target connector (sold separately, product of Renesas Electronics 
Corporation) 

Model name: QB-144GJ-NQ-01T 

MA: Mounting adapter (sold separately, product of Renesas Electronics 
Corporation) 

Model name: QB-144GJ -HQ-01T 

 

Summary of Contents for RTE7701201CFK144T000R

Page 1: ...above the EC The height of the socket is adjustable by inserting the SA between the EC and RTE7701201CFK144T000R if this is desired 2 For on board evaluation Mount the TC an MCU with on chip flash memory or one time PROM and the MA in that order on the target system Before using the RTE7701201CFK144T000R be sure to read the precautions on page 4 R20UT3176EJ0100 Rev 1 00 Sep 05 2014 Figure 1 Extern...

Page 2: ...C to the TC Attach the EC above the TC after confirming there are neither cracks nor bends on the contact pins of the EC 3 Secure the four corners of the EC with the YQ guide screws that came with the EC Screws supplied with the EC Use the flathead screwdriver or torque driver supplied with the EC to secure in order the screws at the four corners The tightening torque of a YQ guide should be no mo...

Page 3: ...000R 55 0 Figure 4 Drawing of the Socket Assembly Unit mm This dimension is increased by 3 2 mm if QB 144GJ YS 01T is used to adjust the height of the socket 18 0 0 5 35 17 5 0 5 0 2 0 5 35 17 5 40 0 55 0 2 RTE7701201CFK144T000R CN1 MADE IN JAPAN CN2 CN3 60 62 120 1 59 61 119 2 60 62 120 1 59 61 119 119 61 59 1 120 62 60 2 5 5 5 5 5 0 13 0 13 0 Figure 5 Drawing with Dimensions and a Pad Pattern fo...

Page 4: ...red by the European Union s Waste Electrical and Electronic Equipment WEEE Directive 2002 96 EC As a result this equipment including all accessories must not be disposed of as household waste but through your locally recognised recycling or disposal schemes As part of our commitment to environmental responsibility Renesas also offers to take back the equipment and has implemented a Tools Product R...

Page 5: ...ease evaluate the safety of the final products or systems manufactured by you 8 Please contact a Renesas Electronics sales office for details as to environmental matters such as the environmental compatibility of each Renesas Electronics product Please use Renesas Electronics products in compliance with all applicable laws and regulations that regulate the inclusion or use of controlled substances...

Reviews: