background image

A1-HV-3.0 
A1-HV-3.68 
A1-HV-5.0
A1-HV-6.0

User Manual

Series

A1-HV 

Summary of Contents for A1-HV Series

Page 1: ...A1 HV 3 0 A1 HV 3 68 A1 HV 5 0 A1 HV 6 0 UserManual Series A1 HV...

Page 2: ...3 Installationprecaution 17 5 4 Availablespace 18 5 5 Preparation 18 5 6 Installationsteps 20 5 7 ElectricalWiringConnection 23 5 7 1 PVWiringConnection 24 5 7 2 InternalElectricalConnectionoftheBatte...

Page 3: ...Target group This manual is intended for quali ed electrical technical personnel who are responsible for All in one ESS installation and commissioning in the energy storage system 1 3 Symbols used 1 4...

Page 4: ...ersonal protective equipment including rubber gloves and protetive boots during the installation or maintenance Battery Module Leakage lf the battery modules leak electrolytes contact with the leaking...

Page 5: ...er and battery power is insufficient the system will take power from grid to support loads PV Energy Storage System Keep the battery modules away from children Observe the documents Observe all docume...

Page 6: ...res the battery will has enough energy to supply during a grid outage The back up load could be supported by PV and battery in the event of a blackout 1 Generated solar energy 2 Load consumption 3 Sto...

Page 7: ...T BAT RS485 port Parallel communication Add Description Object Safety vent BAT connector CAN communication connector 1 2 3 Description Object CAN communication connector BAT connector 4 5 Description...

Page 8: ...Grid Regulation Safety Regulation Certi cations Standards EMC EN 61000 6 1 EN 61000 6 2 EN 61000 6 3 EN 61000 6 4 EN 61000 4 16 EN 61000 4 18 EN 61000 4 29 3680 16 6000 26 1 3000 13 5000 21 7 220 230...

Page 9: ...er bracket Bracket2 connect bracket1 and bracket3 Bracket1 connect BMC600 and bracket2 Frame1 it is used to x the inverter covert and inverter Frame2 It is used to x the terminal cover and inverter In...

Page 10: ...ck that if the relating accessories and the materials are here you can see the accessories list in the table The instruction manual is an integral part of the unit and should therefore be read and kep...

Page 11: ...ment overalls safe shoes protective gloves helmets goggles Do not walk or stand beneath or in the proximity of the load Avoid sudden movements and jolts when unloading and positioning the unit Interna...

Page 12: ...fatigue or ageing This should be calculated by inspection of the design data of supporting material and consulting construction engineer 1 Take the BMC and base out of the package 2 Loose the two scre...

Page 13: ...cket and hang the N1 HV inverter Transportation of the inverter needs at least 2 people each one needs to use the handles at the sides of the inverter Hang the inverter over the bracket move the inver...

Page 14: ...act assembly is seated correctly PV string connection AC output connection Battery connection Battery power connection Battery communication connection EPS connection Earth connection Communication co...

Page 15: ...A The litz wire ends have to be visible in the spring 5 Close the spring Make sure that the spring is snapped in B 6 Push the insert into the sleeve C 7 Tighten the cable gland to 2Nm D Use a suitable...

Page 16: ...ual current of 30mA or higher is recommended There are two AC terminals and the assembly steps for both are the same just need to check one for Grid another for EPS The AC cable and micro breaker spec...

Page 17: ...on the earthling connector Screw the screw of the earthling connector 3 Fully insert the conductors to the corresponding terminal and tighten the screws with the torque 0 8 Nm Pull cables outward to c...

Page 18: ...he inverter in one of the Demand Response Modes DRMs de ned by the standard DRM 0 Operate the disconnection device DRM 1 Do not consume power DRM 2 Do not consume at more than 50 of rated power DRM 3...

Page 19: ...Lower Fast 47 00Hz OK Grid Volt Protect Freq Protect Volt Protect Vac Lower Fast 000 0V OK Volt Protect Vac Lower Slow 180 0V OK Volt Protect Vac Upper Slow 260 0V OK Volt Protect Vac Upper Fast 265 0...

Page 20: ...nd down button to review the parameter Press ESC to return to Status E EPS BMS Vbat V Ibat A Vchr V BMS Vdis V Ichr A Idis A Solar Vpv1 V Vpv2 V Solar Ipv1 A Ipv2 A Solar Ppv1 W Ppv2 W PV Conf Multi T...

Page 21: ...0V OK Volt Protect Vac Upper Fast 265 0V OK Volt Protect Vac 10M Avg 255 0V OK Grid Volt Protect Freq Protect Press up or down button to select different work modes Press OK to con rm C Work Mode Sett...

Page 22: ...tem Switch SysSwitch Turn On OK Menu History Setting SysSwitch This interface shows the information of the inverter such as series number and software version This section contains information and pro...

Page 23: ...rectly connected Or seek help from us The residual current is high Please check if the insulation of electric wires is damaged Wait for a while to check if back to normal Or seek for help from us AD S...

Page 24: ...communication between meter and Inverter is interrupted Check if the communication cable between meter and Inverter is correctly and well connected SCI communication fault Disconnect solar power PV P...

Page 25: ...R T E C H N O L O G Y C O LT D Tel 86 0512 66677278 info renacpower com renacpo er com SMARTENERGYFORBETTERLIFE 422 00003 00 Block C 12 No 20 Datong Road Comprehensive Bonded Zone Suzhou Hi Tech Dist...

Reviews: