Fig. 21: Fix the connection pipes
16.
Installing the side casing.
The two side parts that are included in the
delivery are made of EPP plastic and are
fixed to the two outer corners of the indoor
unit.
Fig. 22: Installing the side casing
17.
Remove the fixing frame from the casing that
you removed (Fig. 12) and feed the 2 m con-
nection cable of the Smart-WP [heat pump]
controller through. Connect the plug to the
operating module of the heat pump.
Fig. 23: Remove the fixing frame
18.
Insert the operating unit from behind into the
provided opening on the front panel as far as
the front sheet.
Fix the operating unit by also inserting the
frame into the opening as far as the Con-
troller.
Fig. 24: Indoor unit with operating unit
19.
After successfully installing the Indoor unit of
the WKF-compact heat pump, the entire
system must be stamped in accordance with
the DIN standard.
During installation, ensure that the dirt trap
that is included in the delivery is installed in
the return flow of the system. Box of acces-
sories (EDP 260008).
All installation tasks that are to be carried out
to install and operate the system may only be
carried out by authorised personnel with the
required expertise.
All connections that are provided by the cus-
tomer must be installed in accordance with
the applicable standards and directives.
REMKO WKF-compact
12