5
Installation
General notes
NOTICE!
Installation should only be performed by author-
ised specialists.
NOTICE!
Preparation of the hot water must be in compli-
ance with the applicable standards.
n
Do not continually top up the water level in the
buffer tank. This will prevent corrosion damage
to the storage tank.
n
If corrosive water is a problem, please note
that special models of the storage tanks can be
tested. (address all queries to your contractual
partner).
n
The storage tank must be filled in accordance
with the applicable DIN 2035 standard!
Damage that result from non-compliance are
not covered by the guarantee.
Electric auxiliary heater
n
Use the 6/4" socket to install an auxiliary
heater (immersion heater).
n
Please note that the electric auxiliary heater
must not be used as a permanent heating
system.
Assignment of the connection ports KPS 130
1
3
2
4
5
Fig. 2: Assignment of the connection ports KPS
130
1: Inlet heat pump/heating cycle 1" AG
2: Optional: Auxiliary heater
(immersion heating) 6/4" IG
3: Return flow heat pump/heating cycle 1" AG
4: Inlet heat pump/heating cycle 1" AG
5: Return flow heat pump/heating cycle 1" AG
Assignment of the connection ports KPS 300
Variant 1:
Heat pump is located to right of buffer tank
3
2
5
8
1
6
4
7
Fig. 3: Assignment of the connection ports KPS
300
1: Connection top 1" AG,
for: bleeding valve, safety assembly
2: inlet heating cycle 5/4" AG
3: immersion tube for temperature sensors
4: Heating circuit return flow and drainage
through customer-provided T-section 5/4" AG
5: inlet heat pump 5/4" AG
6: Optional: Auxiliary heater
(immersion heating) 6/4" IG
7: Cleaning flange or opening for fin-tube heat
exchanger D180 (special accessory)
8: return flow heat pump 5/4" AG
9
Summary of Contents for KPS 130
Page 15: ......