background image

Installation

General notes

 NOTICE!

Installation should only be performed by author-

ised specialists.

 NOTICE!

Preparation of the hot water must be in compli-

ance with the applicable standards.

n

Do not continually top up the water level in the

buffer tank. This will prevent corrosion damage

to the storage tank.

n

If corrosive water is a problem, please note

that special models of the storage tanks can be

tested. (address all queries to your contractual

partner).

n

The storage tank must be filled in accordance

with the applicable DIN 2035 standard!

Damage that result from non-compliance are

not covered by the guarantee.

Electric auxiliary heater

n

Use the 6/4" socket to install an auxiliary

heater (immersion heater).

n

Please note that the electric auxiliary heater

must not be used as a permanent heating

system.

Assignment of the connection ports KPS 130

 

 

 

1

3

2

4

5

Fig. 2: Assignment of the connection ports KPS

130

1: Inlet heat pump/heating cycle 1" AG

2: Optional: Auxiliary heater

(immersion heating) 6/4" IG

3: Return flow heat pump/heating cycle 1" AG

4: Inlet heat pump/heating cycle 1" AG

5: Return flow heat pump/heating cycle 1" AG

Assignment of the connection ports KPS 300

Variant 1:

Heat pump is located to right of buffer tank

 

 

 

3

2

5

8

1

6

4

7

Fig. 3: Assignment of the connection ports KPS

300

1: Connection top 1" AG,

for: bleeding valve, safety assembly

2: inlet heating cycle 5/4" AG

3: immersion tube for temperature sensors

4: Heating circuit return flow and drainage

through customer-provided T-section 5/4" AG

5: inlet heat pump 5/4" AG

6: Optional: Auxiliary heater

(immersion heating) 6/4" IG

7: Cleaning flange or opening for fin-tube heat

exchanger D180 (special accessory)

8: return flow heat pump 5/4" AG

 

 

 

 

 

9

Summary of Contents for KPS 130

Page 1: ...perating instructions Read the instructions prior to performing any task REMKO storage tank systems KPS 130 KPS 300 Buffer tanks for hot cold water Instructions for users and specialists 0117 2018 09 Edition 1 en_GB ...

Page 2: ...ig inal Read these operating instructions carefully before commis sioning using this device These instructions are an integral part of the system and must always be kept near or on the device Subject to modifications No liability accepted for errors or mis prints ...

Page 3: ...r 5 1 7 Safety notes for installation and inspection tasks 5 1 8 Unauthorised modification and changes 5 1 9 Intended use 5 1 10 Warranty 5 1 11 Transportation and packaging 6 1 12 Environmental protection and recycling 6 2 Technical data 7 2 1 Unit data 7 2 2 Unit dimensions 7 3 Unit description 8 4 Installation instructions for qualified personnel 8 5 Installation 9 6 Commissioning 12 7 Care and...

Page 4: ...atal or cause serious injury WARNING This combination of symbol and signal word warns of a potentially hazardous situation which if not avoided may be fatal or cause serious injury CAUTION This combination of symbol and signal word warns of a potentially hazardous situation which if not avoided may cause injury or mate rial and environmental damage NOTICE This combination of symbol and signal word...

Page 5: ...or bypassed 1 8 Unauthorised modification and changes The operational safety of the supplied units components is guaranteed when used in line with intended use in accordance with section 1 9 of the operating instructions Under no circumstances should the threshold values specified in the data sheet be exceeded Modifications or changes to units and components are not permitted and may cause malfunc...

Page 6: ... Environmental protection and recycling Disposal of packaging All products are packed for transport in environ mentally friendly materials Make a valuable contri bution to reducing waste and sustaining raw mate rials Only dispose of packaging at approved collection points Disposal of equipment and components Only recyclable materials are used in the manufac ture of the devices and components Help ...

Page 7: ...y consumption value radiation value as per DIN 44532 kWh d 2 2 2 2 We reserve the right to make technical changes in connection with technical advancement 2 2 Unit dimensions 246 983 1514 305 1797 ø600 90 180 1420 5 924 5 1689 ø670 90 A B 85 340 480 742 G1 G1 G1 G1 Fig 1 Unit dimensions all measurements in mm A KPS 130 B KPS 300 We reserve the right to make technical changes in connection with tec...

Page 8: ...nance repairs and even for the possible replacement of the unit e g avoid narrow passageways and doorways n When installing the buffer tanks in non standard locations such as in lofts residential units with floors that are sensitive to water storerooms etc take account of the possibility of leaking water and ensure that a facility is in place to collect the water including appropriate drainage met...

Page 9: ...uxiliary heater must not be used as a permanent heating system Assignment of the connection ports KPS 130 1 3 2 4 5 Fig 2 Assignment of the connection ports KPS 130 1 Inlet heat pump heating cycle 1 AG 2 Optional Auxiliary heater immersion heating 6 4 IG 3 Return flow heat pump heating cycle 1 AG 4 Inlet heat pump heating cycle 1 AG 5 Return flow heat pump heating cycle 1 AG Assignment of the conn...

Page 10: ... valve safety assembly 2 inlet heat pump 5 4 AG 3 immersion tube for temperature sensors 4 return flow heat pump 5 4 AG 5 inlet heating cycle 5 4 AG 6 Optional Auxiliary heater immersion heating 6 4 IG 7 Cleaning flange or opening for fin tube heat exchanger D180 special accessory 8 Heating circuit return flow and drainage through customer provided T section 5 4 AG REMKO storage tank systems 10 ...

Page 11: ...HGU HGM 1 HGM 2 KPS 300 HPU optional A B D 1 2 3 4 C A Outdoor unit s B Indoor unit C Boiler wall heating device D Storage tank 1 Cooling cycle 2 Unmixed heating cycle 3 Mixed heating cycle 1 4 Mixed heating cycle 2 Installation example hydraulic circuit diagram heat pump package WKF Cologne Schema _WKF_Köln_03_oe_g_m__ww_092014 S 08 HGU HGM 1 HGM 2 KPS 300 A B D 1 2 3 4 C A Outdoor unit B Indoor ...

Page 12: ...e n Clean the units with a damp cloth by adding for instance a liquid household cleaner Do not use any caustic abrasive or solvent based cleaning products Maintenance n It is recommended that you take out a mainte nance contract with an annual service from an appropriate specialist firm This enables you to ensure the operational reli ability of the plant at all times n Regularly check the function...

Page 13: ...nd recycling specialists or at collection points REMKO GmbH Co KG or your contractual partner will be pleased to provide a list of certified firms in your area CAUTION During drainage of the storage tank hot water may escape NOTICE When putting the storage tank back into service ensure that it is filled with water and that water which is free of bubbles is escaping from the valves 9 Spare parts li...

Page 14: ... Operating pressure 7 Operating temperature 7 Ordering spare parts 13 R Rated contents 7 S Safety Dangers of failure to observe the safety notes 4 General 4 Identification of notes 4 Instructions for the operator 5 Note for inspection work 5 Note for installation work 5 Personnel qualifications 4 Safety conscious working 4 Unauthorised modification 5 Unauthorised replacement part manufacture 5 Shu...

Page 15: ......

Page 16: ...ct as advisers to our customers in air conditioning and heating technology SFlbCustomer Service Our equipment operates precisely and reliably However in the event of a fault REMKO customer service is quickly at the scene Our comprehensive network of experienced dealers always guarantees quick and reliable service REMKO INTERNATIONAL and also right in your neighbourhood Make use of our experience a...

Reviews: