background image

8

REMKO HTL 400

 With increased induction  

temperature or resistance at 
the device outlet, it is possible 
that the forced air oil burner is 
switched off briefly by the tem-
perature monitor (TW).  

After reduction of the tempera-
ture the burner will fire up 
again automatically!

   In the case of cycle intervals  

that are too short , the length 
of the hot air ducting should be 
checked. 

 

 

 

  To prevent heat  

  accumulation, sharp edged  
  bends should be avoided in the  
  hose guidance. Film hoses  
  must not be twisted

Air Induction

Using appropriate accessories and/
or connections, the device can be 
operated in fresh air, blended air or 
recycled air mode.

Induction may only be performed 
using stable pipes or similar  
suitable air ducting.

After being checked for 
fulfilment of the local regula-
tions as well as

 

a check by 

authorised, expert personnel, 
the forced air burner must be 
checked and where appropri-
ate reset in terms of its exhaust 
pollution standards.

NOTE

Air Diffusion

The device is fitted with a special 
high performance radial fan which 
is designed to selectively and  
effectively transport the heated air 
across long distances.
The diffusion of the air is best per-
formed using pipes or special hot 
air or film tubes

  Use exclusively the hot air  

  tubes approved by us  
  (accessories) 

  Attention should be paid to the  

  flow direction of the tubes! 
  The internal overlaps on the  
  seams of the hot air tubes must  
  point in the direction of the air  
  flow 

  Secure fastening of the tubes  

  and pipes at the exhaust and  
  any connection points used  
  must be observed 

  Only suitable air diffusers or  

  those approved by us may be  
  used 

 
 

 

  When heating closed rooms  

  using hoses, back pressure must  
  not be allowed to build up

Before commissioning, the device 
should be checked for noticeable 
defects of the operating and safety 
devices, as well as for proper set-
up and correct electrical  
connection.

The following points must be 
taken into consideration:

  It must be assured that the    

  chimneys can be properly    
  expelled

  The device must be  

  set up stably

  An adequate supply of inlet air  

  for combustion must be assured

  Check that there is no  

  physical restriction on air intake  
  and air emission

  Avoid excessively high or low  

  pressure in the operation  
  location

  Assure and adequate supply   

  of fuel which also complies to  
  local requirements

  Only use clean EL heating oil or  

  diesel fuel 
 

Do not use biodiesel!

  It is essential that the suction  

  pipe at the base of the  

 

  tank is fitted with a foot- 
  operated valve

  A safety zone of 1.5 m around  

  the device must be observed,  
  also for non-flammable objects

Prior to Operation

The hot air tubes may only be 
used fully extended and with-
out kinks.

IMPORTANT

Cycle operation of the forced 
air  burner of less than 5 mins.  
should be avoided at all costs.

NOTE

The maximum air intake  
temperature may not exceed 
30 °C

NOTE

CAUTION

In the event of accumulated 
heat, heating operation will 
be continuously interrupted by 
the STB!

Summary of Contents for HTL 400

Page 1: ...Oil red Heating Centers Operation Technology REMKO HTL 400 Edition GB R11...

Page 2: ......

Page 3: ...antee 15 Environmental Protection and Recycling 15 Wiring diagram 16 Maintenance Log 18 Technical data 19 Made by REMKO Before commissioning use of the device these operating instructions must be read...

Page 4: ...he device always observe the respective local construc tion and re protection ordinances as well as the regulations of the employers liability insurance association Description of Device Mobile fuel t...

Page 5: ...matically This process may repeat itself several times Monitoring operation of the device All functions of the device are monitored safely and fully auto matically by the thermostat of the three fold...

Page 6: ...The provision of adequate safety clearance The function Room heating open blown or ducted low pressure or high pressure in the set up room General aspects Heat requirement room temperature nominal air...

Page 7: ...est performed using pipes or special hot air or lm hoses The lengths possible are dependent upon re sistance provided by the air ducting in use When using hot air hoses the following points must be ta...

Page 8: ...the seams of the hot air tubes must point in the direction of the air ow Secure fastening of the tubes and pipes at the exhaust and any connection points used must be observed Only suitable air diffus...

Page 9: ...o preclude errors in measurement each phase conductor and fan stage must be tested separately 2 The setting of the thermal over load relay should be performed as follows Stage 1 6 7 A Stage 2 17 0 A 3...

Page 10: ...c rotation direction monitor for the fan motor NOTE The electrical connection of the device must be performed at a dedicated supply point with an earth leakage circuit breaker in compliance with VDE 0...

Page 11: ...ccessories The devices operate fully auto matically depending on the room temperature 1 Remove jumper plug 2 2 Connect plug 3 of the room thermostat 4 to the thermostat socket 1 at the switch cabinet...

Page 12: ...e Keep the device free of dust and any deposits of dirt Only clean the device with a dry or damp cloth Do not apply any direct water spray e g high pressure hoses etc Do not use abrasive or cleaning s...

Page 13: ...screws to the unit housing Pay attention to the OBEN UP HAUT label 3 Tighten the 2 upper fastening screws 4 Tighten the 2 lower fastening screws only lightly so that the burner ange can be pulled toge...

Page 14: ...the sensors and capillary tubes of the safety devices for damage or dirt 7 Check that the temperature monitor TW for correct func tion using appropriate means 8 Check the forced air burner for possib...

Page 15: ...packaging material at the corres ponding disposal sites Disposal of the old device Manufacture of our equipment is subject to constant quality control Only high quality materials that are recyclable t...

Page 16: ...16 REMKO HTL 400 We reserve the right to make changes in dimensions and design in the interest of technical advance Wiring diagram...

Page 17: ...17 When ordering spare parts always list the EDP no as well as the device no and device type see the type plate Wiring diagram...

Page 18: ...set by authorised expert personnel in accordance with legal speci cations 1 BImSchV An appropriate test log must be kept Maintenance work may only be performed on the forced air burner by authorised e...

Page 19: ...1 Stage kW 245 Ventilating performance max 1 2 Stage m3 h 25000 Ventilating performance max 1 1 Stage m3 h 16600 Pressure max total 2 Stage Pa 1000 Pressure max total 1 Stage Pa 500 Fuel EL heating o...

Page 20: ...ultants is always up to date This has given us the reputation of being more than just a good reliable supplier REMKO a partner that helps solve problems Sales REMKO not only provides an extensive sale...

Reviews: