5
PREFACE
These technical instructions contain useful and important information for the correct instal-
lation, operation and maintenance of the Remeha Selecta combi and system boilers.
Read these instructions carefully before putting the boiler into operation, familiarise
yourself with their control functions and operation, strictly observing the instructions
given. Failure to do so may invalidate warranty or prevent the boiler from operating
correctly.
Installation must be in accordance with current gas safety (installation and use) regula-
tions, the building regulations and relevant codes of practice.
The installation, commissioning and servicing of the boiler must be carried out by a
competent person who holds valid ACS certification and to be a member of CORGI.
All electrical work must be carried out by a competent person and to be installed in
accordance with the current IEE regulations.
Note:
On completion a copy of the commissioning certificate should be completed and
left with the customer.
If you have any questions, require an engineer to call on site, or if you need more
information about specific subjects relating to this boiler, or it’s installation please do
not hesitate to contact our technical help line 0118 978 3434.
The data published in these technical instructions is based on the latest information (at
date of publication) and may be subject to revisions.
We reserve the right to continuous development in both design and manufacture,
therefore any changes to the technology employed may not be retrospective nor may
we be obliged to adjust earlier supplies accordingly.