Inspection of the installation
Readjustments
....................................................................................................................................................................................................................................
....................................................................................................................................................................................................................................
....................................................................................................................................................................................................................................
....................................................................................................................................................................................................................................
....................................................................................................................................................................................................................................
....................................................................................................................................................................................................................................
....................................................................................................................................................................................................................................
....................... ............................................................................................................................................................................................................
Remarks
....................................................................................................................................................................................................................................
....................................................................................................................................................................................................................................
....................................................................................................................................................................................................................................
....................................................................................................................................................................................................................................
....................................................................................................................................................................................................................................
....................................................................................................................................................................................................................................
....................................................................................................................................................................................................................................
Place: .............................................................................................................
Date:.................................................................................................
Owner's signature
Installer's signature
Components on roof:
All mounting bolts tight
yes
All connections checked and leak-free
yes
Solar station:
Outlet and return connections correct
yes
Outlet and return thermometers present and checked
yes
Tank:
Cold water safety kit installed
yes
Pressure reducer set at ................. bar
yes
Thermostatic mixing valve with anti-thermosiphon circuit connected to the solar tank
yes
Thermostatic mixing valve set to..............°C
yes
Tank insulation checked
yes
All connections installed
yes
Expansion vessel:
Pressure of preload of the controlled expansion vessel
yes
Assembly instructions (solar collector, tank, complete station, regulator) handed to the owner
yes
Solar installation operation (regulator) explained to the owner
yes
200SE-2S - 300SE-2S
6. Checking and maintenance
26/04/2016 - 7607575-05
63
Summary of Contents for RemaSol200SE-2S
Page 7: ...26 04 2016 7607575 05 5 ...
Page 74: ...en Appendix Information on the ecodesign and energy labelling directives ...
Page 77: ...1 Specific information 4 7607575 ErP02 21042016 ...
Page 78: ......
Page 79: ......