5 Commissioning
5.1
Check points before commissioning
CAUTION
If the temperature in the solar collectors is higher than
130°C, the control system operates in safety mode. Wait
until the evening before start-up or cool down (cover) the
solar collectors.
5.1.1.
Domestic hot water calorifer
1. Before start-up, the heating installation must be completely
emptied and rinsed.
2. Make sure that all valves on the circuit are opened.
3. Fill the installation with water and check hydraulic tightness.
5.1.2.
Primary solar circuit
¼
See installation and commissioning instructions for the solar
station.
5.1.3.
Primary heating circuit
¼
See boiler installation instructions
5.1.4.
Electrical connection
Check the electrical connections, particularly the earth.
5. Commissioning
200...500C-2S
27
21/03/2016 - 7652081-001-02
Summary of Contents for remasol-2 200C-2S
Page 39: ...en Appendix Information on the ecodesign and energy labelling directives...
Page 42: ......
Page 43: ......