43
25/01/2012 - 300016864-001-C
P 520
55 Installing the bulbs
`
Fix the control panel to the rear of the control panel bracket using 2 screws (H Ø 4 x 40) and serrated washers.
`
Carefully unroll the various bulbs and bring them out of the control panel through the opening in the bottom on the panel.
56
`
Cut out the top insulating material to free the boiler pocket. Then, insert the bulbs inside the pocket and maintain them with the spring.
Only NL:
Connect the safety pressure sensitive switch option.
57
All connections are made with the terminal boxes designed for
that purpose on the back of the boiler's command board.
Z
See the “Electrical Connections” section of the instructions
supplied with the control panel.
00
1
7
M01
M0001
18