30
P 520
25/01/2012 - 300016864-001-C
37 Assembling the top insulating material - 13 to 17 sections
Package FA34 to FA41
Front
- Put in place the 600 mm wide (packages FA30 to FA36) top
insulating material on the body of the boiler.
38 Assembling the cable channels - 13 to 17 sections
Package FA23, FA25, FA27
Rear
`
Place the cable channels so that their bevelled end is to the front.
`
Fasten with 2 screws H8 x 16 + L8 washers in the third hole starting from the front and opposite the special nut.
`
Fasten at the rear with 2 screws H8 x 16 + L8 washers opposite the oblong holes and special nut.
M000099
80
90
1
Number of sections
13
15
17
Length (mm)
1800
2100
2200
0
0
M0
010
AVANT
1