background image

 

 

BA-KommCAN_EN / F0353400

 

June 2016 

 

 

2.2.2

 

Scope of delivery  

The scope of delivery includes the following components:  

 

CAN cable (length 2 m) 

 

CAN terminal resistor (Sub-D) 

 

CAN terminal resistor bushing (Sub-D) 

 

USB stick with EDS file 

 

Operating instructions 

 

2.2.3

 

Other hardware components needed 

Depending on the PLC used, additional hardware components are needed for a functioning 
overall system. Recommendations for this are listed below. 

Components 

Description 

HMS CM CANopen- 
master/slave module for 
SIMATIC S7-1200 PLC 
(021620-B) 

This module can be used to establish communication 
with the PS2000 current source when using a 

SIMATIC S7-1200 PLC

Beckhoff EL6751 CANopen- 
master/slave terminal 

This module can be used to establish communication 
with the PS2000 current source when using a 

Beckhoff PLC

Other manufacturers of PLC modules offer comparable components for your systems.  

 

3

 

Transport / storage

 

 

 

Protect the system from dirt and foreign objects. 

 

Protect the system from impact. 

 

4

 

Unpacking and installation 

4.1

 

Unpacking

 

 

 

Carefully open the packaging. 

 

Take the components out of the packaging. 

 

4.2

 

Installation requirements 

 

Before installing the machine, the following points must be met: 

 

The components must be undamaged.

 

 

 

If installing as a permanent installation or in a building, a suitable switch or circuit 
breaker that satisfies national safety requirements (in Germany: VDE 0100) must be 
fitted as an upstream all-pole cut-off device that will disconnect the system from the 
power supply. This cut-off device should be fitted near the machine and must be easily 
accessible to the user. The switch must also be labelled as the cut-off device for the 
machine. 

 

Only a trained electrician may wire the system. 

 

Observe all installation requirements and safety notices for the additional machines 
connected. 

 
 
 

Summary of Contents for Plasmabrush

Page 1: ...Table of contents BA KommCAN_EN F0353400 June 2016 1 Operating instructions CAN communication package BA KommCAN_EN F0353400 ...

Page 2: ...ed and qualified persons Train your staff The operator user is responsible for ensuring that personnel have fully understood the operation of the machine and the safety requirements Copyright relyon plasma GmbH 2016 All rights reserved All rights reserved Text images and diagrams and their layout are protected by copyright and other laws Unauthorised copying and distribution of this document and t...

Page 3: ...ing conditions 5 2 System description 6 2 1 Function 6 2 2 System overview 6 2 2 1 Description of the components 6 2 2 2 Scope of delivery 7 2 2 3 Other hardware components needed 7 3 Transport storage 7 4 Unpacking and installation 7 4 1 Unpacking 7 4 2 Installation requirements 7 4 3 System component installation 8 5 Operation 9 5 1 Start up 9 6 Environment 10 6 1 Disposal 10 ...

Page 4: ...30 V If damage is visible on the electrical connection mains cable or system Do not start up the system Have the damaged parts repaired by a qualified person or replace them Tripping hazard Lay the connection cables in suitable cable trays Lay cables such that they do not present a tripping hazard 1 2 Information and obligations for the operator The system may emit interference The system has been...

Page 5: ...an coat or remove residue at atmospheric pressure Under no circumstances may the system be used by non trained persons 1 4 Impermissible operating conditions The system must not be operated under the following conditions In explosive Ex zones In areas with severe build up of dust Where there is excessive air humidity 80 rel Where temperatures are outside of 0 40 C or 32 104 F Where there are stron...

Page 6: ... the basic elements for communicating with a PS2000 current source using the CAN bus with a higher level PLC 2 2 System overview 2 2 1 Description of the components No Components 1 CAN cable length 2 m 2 CAN terminal resistor Sub D 3 CAN terminal resistor bushing Sub D 4 USB stick with EDS file 1 2 3 4 ...

Page 7: ...her manufacturers of PLC modules offer comparable components for your systems 3 Transport storage Protect the system from dirt and foreign objects Protect the system from impact 4 Unpacking and installation 4 1 Unpacking Carefully open the packaging Take the components out of the packaging 4 2 Installation requirements Before installing the machine the following points must be met The components m...

Page 8: ...al resistor bushing 3 Connect CAN cable to the rear connection of the PS2000 current source 4 Terminate the CAN bus on the PS2000 with the provided terminal resistor if necessary also refer to the operating instructions of the PS2000 current source if necessary 5 Set the PS2000 node number to the specified setting of the higher level PLC in the software 6 Establish the emergency stop circuit for t...

Page 9: ...y All additional machines components must be correctly connected If these points are met you can use the higher level PLC to control your plasma process Please note that it is essential that a gas flow is present in order to operate the plasma generator A test to ensure sufficient gas flow is present using the higher level PLC is recommended This can be done using a SFAB flow meter type from Festo...

Page 10: ...nt used must not be disposed of along with normal waste The machine contains valuable materials that can be recycled Take the machine to a suitable collection point relyon plasma GmbH Weidener Strasse 16 93057 Regensburg Germany Phone 49 941 60098 0 Fax 49 941 60098 100 E mail info relyon plasma com www relyon plasma com ...

Reviews: