
THERMOJET
®
G-5700E SERIES
OIL PURIFIER SYSTEM
INSTALLATION AND OPERATING MANUAL
Doc #
77740153
Rev
1
Date
June 2020
Page
22
of
90
The ThermoJet Oil Purifier has maintenance access doors on the front of the cabinet. Ensure that
unrestricted access is provided for system troubleshooting and maintenance.
Nitrogen Inlet Connection
The nitrogen supply inlet connection is 3/8” FNPT. The plant’s nitrogen supply line should be
equal to or larger than the 3/8” FNPT connection. The nitrogen supply pressure requirement is )
4.2 BAR (60 PSIG) and must capable of supplying minimum continuous flow rate of 200
liter/minute (7 CFM). During operation the pressure regulator is set at 3.4 BAR (50 PSIG) to
control the flow of the nitrogen supply into the jet mixer.
Maximum nitrogen supply pressure is 10.3BAR (150 PSIG).
Ensure that the Nitrogen supply pressure is
OFF prior to making a tapped connection. The
source should be equipped with a block valve.
WARNING