ENGLISH
______________________________________________________________________________________________
_____________________________________________________________________
C.A.P.T. S.r.l. con Unico Socio
Soggetta a direzione e coord. di
Maschinenfabrik Reinhausen GMBH
Via Postale Vecchia 17
36070 Trissino (VI), Italia
Phone:. +39(0)445/962297
Fax: +39(0)445/490606
http://www.capt.it
E-mail:
PEC :
REINHAUSEN
GROUP
MAN-099-EN - rev.02 EN
14
Insert the second cable inside the tie-rod preventing to overlap the second cable with the one
already mounted. Accommodate the sheath in place on the tie-rod as shown in Figure 25 and 26.
Figure 25. Figure 26.
Pull at the same time the two cables with the maximum force and fix the screw a 5 Nm (C) as
shown in Figure 27.
Figure 27.
Cable adjustment: Operate three maneuvers till extreme positions in order to check the cables
tension. By the tire-rod adjust the cable tension till reach the correct position of moving contacts
in each tap-changer position. Check the correct position rotating the knob in both directions.
Adjust / cut the exceeding cables from handle mechanism.
C
B
B
B
A
A