EN
15. Optional step
Attach the holding rope to Component 2 (an
optional step to prevent the milled out section
falling into the main pipe).
16. Mill out the opening in the main pipe by
turning the milling fixture clockwise.
If necessary, pass over the starting point with
several left/right turns in order to obtain a
clean cut. Remove the swarfs in the milling
area.
17. Move the guide rollers back using the toggle
screw. Take out the milling fixture and the
milled out section and remove the clamping
rope.
18. Weld the connection pipe to the saddle
outlet according to the assembly instructions
„AWADUKT PP electrofusion fitting for
AWADUKT PP SN10/HPP SN16 pipes“.
18
Summary of Contents for AWADUKT PP
Page 10: ...NOTIZEN DE...
Page 19: ...EN NOTES 19...