14
| Poêle et encastrable à granules Greenfire GF55 / GFI55 - Manuel technique
installation
OUTSIDE VERTICAL INSTALLATIONS
To accomplish a outside vertical pipe installation, follow steps 1 through 5
in the "Inside Vertical Installation" section and then finish it by performing
the following (refer to Figure 16).
1.
Install a tee with clean out on the outside of the house.
2.
Install PL vent upward from the tee. Make sure that you install support
brackets to keep the vent straight and secure.
3.
Install ceiling thimble and secure the flashing as you go through the
roof.
4.
Ensure that the rain cap is approximately 24” (610 mm) above the
roof.
Rain cap
Flashing
24"
(61 cm)
3"
(7.5cm)
Tee with
cleanout
Fresh air
intake
3" (7.5 cm)
Clearance
Support
bracket
Type "L", "PL" or
all fuel vent
Figure 16: Outside Vertical Installation.
HEARTH MOUNT INSTALLATION
1.
Lock fireplace damper in the open position.
2.
Install a positive flue connector at the fireplace dampers.
3.
Connect a clean-out tee or a 90° elbow to the exhaust pipe.
4.
Install flexible stainless steel liner or listed pellet vent to the top of the
chimney.
Floor
Protection
Combustible Floor
Masonry Fireplace
Min 6"
(150 mm)
Mantel
Minimum 8" (20 cm)
from top of stove
Damper Removed
or Fastened Open
Clean-out
Fresh-air intake
should com from
chimney. If holes
already exist
fresh-air intake can
be taken through
back of the fireplace
or through
the ash dump.
Figure 17: Hearth Mount - Side View.
Summary of Contents for greenfire GF55
Page 32: ...32 Poêle et encastrable à granules Greenfire GF55 GFI55 Manuel technique garantie ...
Page 33: ...Poêle et encastrable à granules Greenfire GF55 GFI55 Manuel technique 33 notes ...
Page 34: ...34 Poêle et encastrable à granules Greenfire GF55 GFI55 Manuel technique notes ...
Page 35: ...Poêle et encastrable à granules Greenfire GF55 GFI55 Manuel technique 35 ...