30
Regency GF900L-1 Gas Fireplace
installation
CONVERSION KIT #466-967 FROM NG TO LP/ULPG
FOR GF900L USING SIT 845 NOVA GAS VALVE
919-131a
05/05/14
PRIOR TO CONVERSION, ENSURE UNIT HAS COOLED TO ROOM
TEMPERATURE, ALL POWER IS DISCONNECTED AND GAS SUPPLY
IS TURNED OFF.
1
. Remove faceplate, inner frame, glass door, front trim piece and inner
panels- see instructions in this manual.
FOLLOWING STEPS FOR GF900L:
2
. Remove logs.
3
. Remove burner side panels by lifting out as shown in Diagram 1.
4.
Remove burner by removing 2 screws in locations shown below.
Diagram 1 - Burner Side Panels
Diagram 2 - Burner Screw Locations
Diagram 3 - Rear Log Tray Screw Locations
Diagram 4 - Burner Tray Screw Locations
CONVERSION KIT #466-967 FROM NG TO ULPG
FOR GF900 USING SIT 845 NOVA GAS VALVE
THIS CONVERSION MUST BE DONE BY A QUALIFIED GAS FITTER
IF IN DOUBT DO NOT DO THIS CONVERSION !!
5.
Remove rear log tray by removing 3 screws as shown in Diagram 3
below.
FOLLOWING STEPS FOR GF900C:
6
. Remove glass crystals and stones, if installed.
7
. Remove 3 screws in locations shown below to remove burner tray.
Each Kit contains one LP / ULPG
Conversion Kit
GF900C Kit# 466-967
Qty.
Part #
Description
1
904-345
Burner Orifi ce #53
1
918-590
Decal “Converted to LP”
1
908-528
Red Propane Label
1
918-272
Conversion to ULPG decal
1
904-529
5/32” Allen Key
1
910-037
LP Injector
1
911-137
Pilot hood holding clip
1
918-273
Red ULPG label
1
919-131
Instruction Sheet
IT WOULD BE BENEFICIAL TO CONVERT THE APPLIANCE PRIOR TO
THE UNIT BEING INSTALLED OR WALL FACING MATERIAL FITTED
WHICH ALLOWS ACCESS TO THE BOTTOM PANEL.
1
GF900