background image

12

Regency

®

 F39 Room Sealed Freestanding Gas Stove

Pipe Length

Round Support

Box/Wall Thimble

(Part # 940)

Round

Support Box/
Wall Thimble

(Part # 940)

Vertical

Terminal

Storm Collar

Part # 953

Flashing

943 or 943S

Ceiling Firestop

(Part # 963)

24" (610mm)

Pipe Length

Adj.Pipe Length

11" - 14-5/8"

(279mm - 372mm)

90 Elbow

o

Wall Thimble

Part # 942

Vinyl Siding

Standoff (Optional)

Part #950

AstroCap

Termination Cap

(Part# 946-523)

DURA-FLUE 

TERMINATION KIT

Planning Your Dura-Flue 

Installation

There are two basic types of Dura-Flue Room 
Sealed System installations: horizontal termi-
nation and vertical termination. Confi rm the 
maximum horizontal run and maximum vertical 
rise from the diagrams, refer to "Fluing Arrange-
ments" section. 

When planning your installation, it will be nec-
essary to select the proper length of fl ue pipe 
for your particular requirements. For horizontal 
installations, determine the minimum clearance 
from the rear of the unit to the wall. It is also 
important to note the wall thickness.  (The wall 
thimble is suitable for 2 x 4 or 2 x 6 wall construc-
tion.) Select the amount of vertical rise desired 
for "vertical-to-horizontal" type installations.  

Warning:  Always maintain required clear-
ances (air spaces) to nearby combustibles 
to prevent a fi re hazard. Do not fi ll air spaces 
with insulation. 

The minimum clearance requirements between 
the outer wall of the fl ue pipe and nearby com-
bustible surfaces is 1-1/4 inch. Be sure to check 
the fl ue termination clearance requirements 
from decks, windows, soffi ts, gas regulators, air 
supply inlets and public walkways as specifi ed 
in the Exterior Flue Terminal Locations on page 
8 and in your local building codes.

To determine the length of fl ue pipe required 
for vertical installations, measure the distance 
from the unit fl ue outlet to the ceiling, the ceiling 
thickness, the vertical rise in an attic or second 
storey, and allow for suffi cient vertical height 
above the roof line. 

For multi-storey applications, fi re stops are 
required at each fl oor level. If an offset is 
needed, additional pipe, elbows and supports 
will be required.

Do not exceed the maximum number of elbows.  
One 90

o

 for horizontal terminations and two 45

o

 

for vertical termination.

DURA-FLUE FLUING 

COMPONENTS

You will require the following components with 
your new Regency

®

 Room Sealed Freestand-

ing Gas Stove. Please review your product to 
make sure you have everything you need. In 
the efl ue that you are missing any part, contact 
your dealer. 

Note: 

These are the minimum pieces re-
quired. Other parts may be required 
for your particular installation. See 
page 12 for a list of fl ue parts.

If installing termination on a siding covered wall, 
a vinyl siding standoff or furring strips can be 
used in order to ensure that the termination is 
not recessed into siding.

The vinyl siding standoff is required for walls 
with vinyl siding.

Minimum components for a Dura-Flue 
Horizontal 
Installation:

 
A) Dura-Flue 

Horizontal 

Termination 

Kit

B)  Wall Thimble (required  for combus-
 tible 

walls)

Minimum components for a Dura-Flue Verti-
cal Termination:

C) Dura-Flue 

Vertical 

Termination 

Kit

 

See page 12 for pipe lengths.

The Simpson Dura-Flue Room Sealed System 
offers a complete line of component parts for 
installation of both horizontal and vertical installa-
tion. Many items are offered in decorative black, 
as well as galvanized fi nish. The galvanized pipe 

INSTALLATION

and fi ttings are used for concealed locations 
such as attics or where corrosion is a factor, 
such as above the roof line. Decorative brass 
trim kits are available for both wall thimbles and 
ceiling support boxes.  

Part # 

  Description

971 Horiz. 

Termination 

Kit 

includes: 

90

 

black elbow, wall thimble cover, 

 

horiz. square termination cap, 

24" 
 

black pipe, 11" -14" 5/8" adjust-

able 
 

black  pipe 

970 Basic 

Horiz. 

Termination 

Kit 

 includes: 

 

90

o

 black elbow, wall 

 

thimble cover, horiz.  square 

 termination 

cap

978 Vert. 

Termination 

Kit 

includes 

 

0/12 -  6/12 pitch adjustable 

 

fl ashing, storm  collar, low profi le

 term. 

cap

908B 

6" Pipe Length-Black 

907B 

9" Pipe Length-Black 

906 

12" Pipe Length Galv.

906B 

12" Pipe Length-Black  

904 

24" Pipe Length Galv.

904B 

24" Pipe Length-Black 

903 

36" Pipe Length Galv. 

903B 

36" Pipe Length-Black 

902 

48" Pipe Length Galv.

902B 

48" Pipe Length-Black 

911B 

11"-14 5/8" Adj. Pipe Length-

Black 
917B 

17"- 24" Adj. Pipe Length Black 

945 45

Elbow Galv.

Dura-Flue Basic 

Horizontal Kit # 970

1 90

o

 Elbow

1 Wall Thimble Cover
1 Astro Cap

Summary of Contents for F39-LPG

Page 1: ...n consult an authorized installer service agency or the gas supplier FOR YOUR SAFETY Do not store or use gasoline or other flam mable vapours and liquids in the vicinity of this or any other appliance Installation and service must be performed by an authorized installer service agency or the gas supplier PLEASE KEEP THESE INSTRUCTIONS FOR FUTURE REFERENCE Owners Installation Manual LISTINGS AND COD...

Page 2: ... you with all the warmth and charm of a woodstove at the flick of a switch The models F39 NG and F39 LPG of this series has been approved by Warnock Hersey for both safety and efficiency As it also bears our own mark it promises to provide you with economy comfort and security for many trouble free years to follow Please take a moment now to acquaint yourself with these instructions and the many fea...

Page 3: ...ance 26 Removing Valve 27 PARTS LIST F39 Main Assembly 28 F39 Burner Log Assembly 29 F39 Door Assemblies 30 WARRANTY Warranty 31 Unit Specifications 2 SAFETY LABEL Safety Label 4 INSTALLATION Important 5 Specifications 5 Before You Start 5 General Safety Information 5 Installation Checklist 6 Exterior Flue Termination Locations 8 Fluing Arrangements 9 DV Stove Horizontal Flue Kit 10 DV Stove Horizon...

Page 4: ...SealedFreestandingGas Stove We have printed a copy of the contents here for your review The data plat is located on the inside of the drop down pedestal door NOTE Regency units are constantly being improved Check the label on the unit and if there is a difference the label on the unit is the correct one Australia Only ...

Page 5: ...the floor 4 This appliance is Listed for bedroom instal lations when used with a Listed Millivolt Thermostat Some areas may have further requirements check local codes before installation 5 This appliance is Listed for Alcove installa tions maintain minimum Alcove clearances asfollows minimumwidthof48 1219mm a maximum depth of 36 914mm and minimum ceiling height of 64 1626mm 6 We recommend that you...

Page 6: ...0 Be aware of electrical wiring locations in walls and ceilings when cutting holes for termination 11 Under no circumstances should this ap pliance be modified Parts that have to be removed for servicing should be replaced prior to operating this appliance 12 Installation and any repairs to this appliance should be done by an authorised service person Anauthorisedservicepersonshould be called to in...

Page 7: ...Termination Location section INSTALLATION PRECAUTIONS These fluing systems are engineered products that have been designed and tested for use with the F39 NG and F39 LPG The warranty will be voided and serious fire health or other safety hazards may result from any of the fol lowing actions 1 Installation of any damaged Room Sealed component 2 Unauthorized modification of the Room Sealed System 3 Ins...

Page 8: ...anical air inlet or any other opening into a building with the exception of sub floor ventilation see also Note I Appliances up to 150 MJ h input 500 Appliances over 150 MJ h input 1500 k Vertically below an openable window door or non mechanical air inlet or any other opening into a building with the exception of sub floor ventilation see also Note I see table below Clearance k in mm Space Heaters ...

Page 9: ...ns for All Fluing Systems Theshadedareasinthediagrambelowshowallallowablecombina tions of vertical runs with horizontal terminations Maximum one 90O elbow two 45o elbows equal one 90o elbow LPG and NG Residential Manufactured and Mobile Homes Installations The fluing arrangements diagrammed below have a min of 75 flue loss efficiencywithFanOff asrequiredformanufacturedhomes Actual efficiency may be as...

Page 10: ...nto position from theexterior Thelargerdiameterend of the adjustable pipe goes to the flue terminal c Install the 90o elbow onto the adjust able pipe to determine the vertical centerline of the starter collar on the unit Note if the centerline cannot be met the adjustable sections will have to be cut d Cut the 2 ft section of rigid pipe to length Ensure that the pipe length DV STOVE HORIZONTAL FLUE...

Page 11: ...y sealing with Mill Pac and or high temperature silicone and securing with 3 of the 8 x 1 2 black screws Pipe seams should be facing the wall 16 Attachthe90o elbowontothepipesectionby sealing with Mill Pac and or high tempera ture silicone and securing with 3 of the 8 x 1 2 screws black 17 Slide the 2 ft pipe section onto the 90o el bow The flex may have to be compressed back in order for the pipe ...

Page 12: ...ed the maximum number of elbows One 90o for horizontal terminations and two 45o for vertical termination DURA FLUE FLUING COMPONENTS You will require the following components with your new Regency Room Sealed Freestand ing Gas Stove Please review your product to make sure you have everything you need In the eflue that you are missing any part contact your dealer Note These are the minimum pieces re...

Page 13: ...ard This could cause high temperatures and may present the possibility of a fire INSTALLATION DURA FLUE HORIZONTAL INSTALLATIONS 1 Set the unit in its desired location Check to determine if wall studs or roof rafters are in the way when the fluing system is attached If this is the case you may want to adjust the location of the unit 2 RoomSealedpipeandfittingsaredesigned with special twist lock conne...

Page 14: ...in diagram 12 or local codes Note that for steep roof pitches the vertical height must be increased Apoor draft or down drafting can result from high wind conditions near big trees or adjoining roof lines in these cases increasing the flue height may solve the problem Roof Pitch Minimum Flue Height Feet Meters flat to 7 12 2 0 61 over 7 12 to 8 12 2 0 61 over 8 12 to 9 12 2 0 61 over 9 12 to 10 12 2...

Page 15: ...lows Slope X 0 12 2 12 4 2 12 7 12 5 1 2 7 12 12 12 6 3 4 12 12 24 12 7 1 2 24 12 12 1 2 1 Situate the chimney in a convenient loca tion as near as possible to the appliance outlet Cut and frame a hole in the roof for the support The sides of this hole must be vertical with 1 1 4 clearance 2 Place the support in the opening Lower it to the correct height as determined by the table and diagram belo...

Page 16: ...at screwdriver 3 Attach manometer to IN and or OUT pressure tap s using a 5 16 ID hose 4 Light the pilot and turn the valve to ON position Read manometer 5 The pressure check should be carried out with the unit burning and the setting should be within the limits specified on the safety label 6 When finished reading manometer turn off the gas valve disconnect the hose and tighten the screw clockwise ...

Page 17: ...i low knob Fig 1 Fig 2 14 Flip the screw Fig 3 Fig 4 Fig 3 15 Using the Allen wrench as shown in Fig 4 rotate the screw clock wise until snug do not overtighten 12 Insert a 5 32 or 4mm Allen wrench into the hexagonal key way of thescrew Fig 2 rotate itcounter clockwiseuntil it is free and extract it 13 Check that the screw is clean and if necessary remove dirt Conversion Kit Contains Qty Part Desc...

Page 18: ... Description 1 904 390 Burner Orifice 52 LPG 1 918 034 Decal Converted to 30 000 Btu 1 918 033 Instruction Sheet Additional Piece pkg with unit 1 Log Bracket Restrictor 1 Shut off the gas supply 2 Open the front door Carefully remove the logs and lava rock 3 Remove burner See diagram below Burner Orifice 4 Unscrew the 2 Rear Log Pins and move tothefrontholeposi tion 5 Remove Rear Log Bracketandslide...

Page 19: ... Pin D 02 46 B 02 56 A 02 65 7 Place the Left Top Log D 02 46 on the pin on Log B 02 56 and on top of the cutout on Log A 02 65 E 02 45 C 02 44 8 Place Front Right Log E 02 45 on the two pins as shown 9 Place the lava rock in the area between the left and right logs leaving a space in the middle for log F 02 47 Cutout Notch F 02 47 E 02 45 A 02 65 10 Place the notch in Center Log F 02 47 over Log ...

Page 20: ...per setting If they are too hard or too easy to close you may want to adjust them by loosening the latch catch See diagram 3 Diagram 2 Diagram 3 5 Remove the blue plastic protective coating from the glass 6 Test the seal around the door by placing a piece of paper between the unit and the door close the door and try to pull the paper out If it slips out easily then the door is not properlysealed T...

Page 21: ...pped with a three pronged grounding plug for your protection against shock hazard and should be plugged directly into a properly grounded three prong receptacle Do not cut or remove the grounding prong from This heater does not require a 240VA C supply forthegascontroltooperate A240VA C power supply is needed for the fan blower operation INSTALLATION Caution Ensure that the wires do not touch any ...

Page 22: ...lass front as part of the curing process The glass should be cleaned or the film will bake on and become very difficult to remove Use a non abrasive cleaner and NEVER clean the glass while it is hot 4 Turn the PILOT knob counterclockwise to pilot and align it with the arrow as shown in diagram above 5 Push in PILOT knob all the way in and hold ImmediatelypushIGNITORbuttonuntilpilot lights Continue t...

Page 23: ...t call STOP Read the safety information above on this label 1 Push in gas control knob slightly and turn clockwise to OFF Knob cannot be turned from PILOT to OFF unless knob is pushed in slightly Do not force 2 Wait five 5 minutes to clear out any gas If you then smell gas STOP follow B in the safety information above on this label If you don t smell gas go to the next step 3 Turn knob on gas cont...

Page 24: ...ttern will have small probably yellow flames not coming into proper contact with the rear of the burner or thermopile WARNING CHILDREN AND ADULTS SHOULD BE ALERTED TO THE HAZARDS OF HIGH SURFACE TEMPERATURE AND SHOULD STAY AWAY TO AVOID BURNS OR CLOTHING IGNITION YOUNG CHILDREN SHOULD BE CAREFULLYSUPERVISEDWHEN THEY ARE IN THE SAME ROOM AS THE APPLIANCE 7 Each time the appliance is lit it may cause...

Page 25: ... of the left side retainer 7 Put gasket glue on the retainers but do not put glue on the screws Replace the door gasket the two ends butt tight together on the bottom edge of the door 8 Replace door on the stove and check the seal LOG REPLACEMENT The unit should never be used with broken logs Turn off the gas valve and allow the unit to cool before opening door to carefully remove the logs The pil...

Page 26: ...he following procedure a tighten top bottom outside corner nuts 2 b tighten inside nuts 3 c tighten top bottom inside corners 2 8 Tighten the 10 nuts on center glass re tainer 9 Repeat step 7 for other side panel 10 Replace new gasket by gluing it in place 11 Install door onto stove and check the seal To remove F39 fan 1 Unplug or disconnect power source to stove 2 Remove all logs and the rear log...

Page 27: ... control panel is off or you canaccessitthroughtherearpedestalcover plate 6 Carefully remove the logs and lava rock 7 Remove burner If your valve requires maintenance or replace ment use the following instructions Note Always close off the gas supply before removing the valve 1 Open front pedestal door You may want to put a soft cloth on the base of the unit so that when the pedestal door is open ...

Page 28: ...0 Volt 12 910 714 Power Cord 240 Volt 15 560 525 Pedestal Assembly 16 730 039 Pedestal Door 17 904 257 Pedestal Door Magnet 18 560 025 Pedestal Back 19 730 530 Side Panel Door Assy Right Side 20 730 525 Side Panel Door Assy Left Side 21 560 031 Side Panel Door Hinge 23 904 258 Side Panel Door Magnet 24 948 255 Door Latch 25 Flex Pipe 3 ID 26 Clamp for Flex Pipe 27 910 233 Fan Auto On Off Thermodis...

Page 29: ...910 038 Pilot Assy S I T 3 Flame NG 910 039 Pilot Assy S I T 3 Flame LPG 67 Pilot Holder 68 W840470 Pilot Assembly Gasket 71 730 528 Log Stand 904 641 Pilot Orifice 50 NG 75 730 935 Log Set 78 730 550 Burner Assembly 82 630 009 Gasket Burner Tray Air Passage 83 630 008 Gasket Burner Tray Firebox 90 910 386 Thermocouple 91 910 341 Thermopile 92 Rear Log 93 Left Top Log 94 Center Log 95 Middle Right ...

Page 30: ...26 Black Mitred Door Complete 730 932 Gold Wrap Door Complete 730 928 Gold Panel Door Complete 101 650 920 Door Gasket Kit 105 Ceramic Paper 106 940 323 P Side Glass 107 936 243 Glass Gasket 108 940 322 P Centre Glass 111 Door Frame Fibre Paper 112 750 015 Door Glass Extrusion 208 940 325 P Wrap Glass Not available as a replacement part ...

Page 31: ...ited lifetime warranty to the original purchaser of a Regency Product The Warranty Lifetime Covered under the agreement are the following components Combustion chamber heat exchanger burner tubes logs embers glass thermal breakage and all gold plating against defective manufacture The above will be covered for parts and labour for the first five years and parts only thereafter Electricalcomponentssu...

Reviews: