City Series CB72EPV
|
35
installation
Framing Dimensions Corner Kit - Corner Install (Right Corner)
NOTE:
Framing may be constructed of combustible material (ie. 2 x 4)and does not require steel studs.
Note: A combined minimum of
288 square inches of open area is
required for the convection air outlet
to cool the enclosure.
Ensure clearances for Convection
Air Outlets are met.
See clearances CB72EPV in this
manual as there are different meth-
ods as to how this can be achieved.
Note: This appliance must be in-
stalled on a level and solid surface
such as a plywood floor which must
be the full width and depth of the
appliance.
Framing
Dimensions
Description
Corner Kit
A
Framing Height
51” (1295mm)
B
Framing Width
84" (2134mm)
C
Framing Depth
20-5/8" (524mm)
D
Unit Base to Top Enclosure (Min.)
87"(2210mm)
G
Vent Centerline Height
55-1/4" (1403mm)
NOTE: Unit cannot be load-bearing. All finishing materials must be supported by the framing.
Maximum material di-
mensions 2" x 4" for
header studs (installed
on edge and flat)
Summary of Contents for City CB72EPV-LP
Page 113: ...City Series CB72EPV 113 notes ...
Page 118: ...118 City Series CB72EPV ...
Page 119: ......