background image

Regency Narrabri™ Freestanding Wood Fire

5

BOTTOM SHIELD AND LEG 
INSTALLATION

UNIT DIMENSIONS

679

193

490
340

250

353

458

505

153

145

40

 

5

4

3

2

1

1

. Carefully roll unit on it's back

2

.  Bolt each leg from the inside onto the fi rebox with heat shield 

in place.

3

.  Position heat shield on the inside of each leg. Ensure a 5 mm 

gap remains (width of top of each leg). 

Heat shield must be properly fi tted.

1

Bottom shield

2

Legs x 4

3

M6 washer x 8

4

Spring washer x 8

5

Screws x 16

Summary of Contents for NARRABRI F100B

Page 1: ...property damage Refer to this manual For assistance or additional information consult an authorised installer service agency or the distributor FOR YOUR SAFETY Do not store or use petrol or other fla...

Page 2: ...manual please contact the REGENCY DEALER in your area Keep those REGENCY FIRES burning SAFETY NOTE If this wood fire is not properly installed a house fire may result For your safety follow the insta...

Page 3: ...oor Latch Adjustment 9 Wood Storage 9 PARTS LIST Stove Assembly 10 WARRANTY Warranty 11 Data Badge 4 Unit Dimensions 5 Heat Shield Position 5 INSTALLATION Residential Installation 6 Safety Guidelines...

Page 4: ...that accompanies each F100B Freestanding Wood Fire We have printed a copy of the contents here for your review SAFETY LABEL NOTE Regency units are constantly being improved Check the label on the unit...

Page 5: ...0 5 4 3 2 1 1 Carefully roll unit on it s back 2 Bolt each leg from the inside onto the firebox with heat shield in place 3 Position heat shield on the inside of each leg Ensure a 5 mm gap remains wid...

Page 6: ...ventsmoke spillage as this may set off a false alarm 5 Do not overfire heater If the chimney con nector flue baffle or the stove top begin to glow youareoverfiring Stopaddingfueland close the draft co...

Page 7: ...ng From Back 200mm The floor protector should consist of 12mm thick cement fibre sheet which has a thermal conductivity of 23W m K The flue pipe shall extend not less than 4 6m above the top of the fl...

Page 8: ...ports at the top of the firebox just below the flue baffle OPERATING INSTRUCTIONS With your unit now correctly installed and safety inspected by your local authority you are now ready to start a fire...

Page 9: ...in an extremely hot fire WARNING Thingstorememberincase of a chimney fire 1 Close all draft and damper controls 2 CALL THE FIRE DEPARTMENT Ways to Prevent and Keep Unit Free of Creosote 1 Burn stove w...

Page 10: ...2 Bottom Shield 3 1480101 Air deflector 12 1484000 Leg 4 1141602 Air slide shaft 13 1481007 Top Brick Supporter 5 1485000 Air slide 14 1483000 Firebrick retaining bracket 6 3720103 Door rope seal 15 1...

Page 11: ...ill not be liable for results or costs of workmanship from unauthorised service persons or dealers At all times Regency Fireplace Products reserves the right to inspect product in the field which is c...

Page 12: ...__________________________________________________ Serial No __________________________________________________________ Register your Regency warranty online www regency fire com au Reasons to registe...

Reviews: