14
|
Regency Horizon® HZO42 Gas Fireplace
|
14
installation
UNIT ASSEMBLY PRIOR TO INSTALLATION
The 6 Standoffs must be correctly positioned and attached before unit is slid
into position.
STANDOFF ASSEMBLY
The standoffs are shipped in a flat position and must be folded into shape
and attached.
1)
Remove the standoffs from the fireplace.
2)
Take each standoff and bend into the correct shape. Bend up at the bend
lines until the screw holes in the standoff and the pre-punched screw holes
on the fireplace top line up.
3)
Attach the standoff securely to the unit with 2 screws per standoff (on
opposite corners).
S
tandoffs installed
Nailing Strips
Note:
Depending on the material used for finishing, the nailing strips must
be set accordingly so that the finished material is always at the 1-1/2"
edge of the flange.
Finished
Material
Nailing Strip
Position
1/2"
1"
1"
1/2"
1-1/2"
0" (flush)
Unit
Nailing Strip
1” Forward
Unit
Nailing Strip
½” Forward
Unit
Nailing Strip
Flush w/unit
Factory Set
NAILING STRIPS
The nailing strips come attached to the unit. There is 1 plate on each side
and 1 on the top that can be folded out as required.
Secure the top and side nailing strips to the framing.
Summary of Contents for Horizon HZO42-LP
Page 48: ......
Page 49: ...Regency Horizon HZO42 Gas Fireplace 49 49 notes ...
Page 50: ...50 Regency Horizon HZO42 Gas Fireplace 50 notes ...
Page 51: ......