Regency Horizon
®
HZ33CE-11 Gas Fireplace
| 15
installation
This includes:
1. Clocking the appliance to ensure the correct
firing rate (rate noted on label), after burning
appliance for 15 minutes.
2. If required, adjusting the primary air to ensure
that the flame does not carbon. First allow the
unit to burn for 15-20 min. to stabilize.
CAUTION: Any alteration to the product that
causes sooting or carboning that results in dam-
age is not the responsibility of the manufacturer.
LOCATING YOUR
GAS FIREPLACE
1. When selecting a location for your fireplace,
A) Flat on Wall
B) Flat on Wall Corner
C) Recessed into Wall/Alcove
D) Corner
Diagram 1
ensure that the clearances are met.
2. The appliance must be installed on a flat, solid,
continuous surface For example a wood, metal
or concrete floor or in a raised (on the wall)
application. The appliance must be installed on
a metal or wood panel extending the full width
and depth of the appliance.
3. The HZ33CE Gas Fireplace can be installed in
a recessed position or framed out into the room
as in A, B, C and D. See Diagram 1.
9. Test Gas Pressure (Refer to "Gas Pipe Pressure
Testing" section).
10. Install standard and optional features. Refer to
the following sections:
a)
Plug AC adaptor into 120 volt receptacle
b)
Code Remote supplied with unit
c)
Optional Enamel Panels
d)
Glass crystals or Fire beads
e)
Volcanic Stones
f)
Driftwood Logs
g)
Standard Flush Door
h)
Safety Screen
i)
Wall thermostat
j)
Fan Installation
k)
4-sided faceplate
11. Final check.
Before leaving this unit with the customer, the installer
must ensure that the appliance is firing correctly and
operation fully explained to customer.
INSTALLATION CHECKLIST
1. Locate appliance:
a) Room location (Refer to "Locating Your Gas
fireplace" section)
b) Clearances to Combustibles (Refer to
"Clearances" section)
c) Mantle Clearances (Refer to "Mantel
Clearances" section)
d) Framing & Finishing Requirements (Refer
to "Framing & Finishing" section)
e) Venting Requirements (Refer to "Venting"
section)
2. Assemble Top and Side Standoffs (Refer to "Unit
Assembly Prior to Installation).
3. Slide unit into place.
4. Install vent (Refer to "Venting Arrangement"
sections).
5. Wire 120 volt AC power to receptacle box.
Note : This heater does not require 120 volt AC
supply for operation of the burner but is highly
recommended as a primary power source to
eliminate the need for 4 AA batteries. Batteries
should only be used as a secondary power
source when power is lost within the home. 120
Volt AC power is also required for the optional
blower.
6. Install junction box supplied with appliance.
Install remote receiver inside of junction box.
Hook receiver to wire marked receiver. This
will enable operation of the burner (only if 120
volt AC power to burner has not been supplied)
manually when positioned in the "ON" position.
If 120 Volt AC power was brought to appliance,
batteries are not required.
7. Make gas connections (Refer to "Gas Line
Installation section).
8. Test the pilot (Refer to "Pilot Adjustment"
section).
4. This appliance is Listed for bedroom installations
when used with a listed Millivolt Thermostat.
Some areas may have further requirements,
check local codes before installation.
5. The HZ33CE Gas Fireplace is approved for
alcove installations, see "Clearances" section
for details.
6. We recommend that you plan your installation on
paper using exact measurements for clearances
and floor protection before actually installing this
appliance. Have an authorized inspector, dealer,
or installer review your plans before installation.
Note: For vent terminations refer to "Exterior
Vent Termination Locations" section.