English
9
STEP 2
Once the
crib rail
is properly
placed, check to make
sure the
left and right swing
lock and strap assemblies
are parallel to one another.
Then, place the mattress on
top of the assembly.
NOTE:
In order for the crib
mesh wall
to be firmly held against the side of
the mattress you MUST properly tighten the
anchoring straps
. Please follow
STEPS 3 – 4 carefully.
STEP 3
Tighten the straps to bring the
crib rail
into its proper position. To tighten the
straps, first release the strap locks on the under side of the
left and right under
bars
. Pull the straps towards you until all the excess slack has been pulled out
from under the mattress.
Summary of Contents for Swing Down 2015
Page 2: ......