
31
8. Preparations
The model ship „Discovery II“ is delivered ready for operation. Only a few steps, such as installation of the receiver
system and assembly of ballast keel, mast and sail, are required for commissioning.
Before completing the model or taking it into operation, read each section carefully. The construction stages are
almost always illustrated for better understanding.
Note that the numbers in the text always refer to the components in the illustration to the right.
Only carry out the steps described in the different sections if you have completely understood the procedure and know
exactly what to observe.
a) Boat Rack Assembly
The scope of delivery includes a boat rack of wood
parts that has to be assembled before first use.
Then install the tail spur as shown in figure 1.
Figure 1
Summary of Contents for 1195424
Page 18: ...18 Bild 13 ...
Page 40: ...40 Figure 13 ...
Page 62: ...62 Figure 13 ...
Page 84: ...84 Afbeelding 13 ...
Page 90: ...90 ...
Page 91: ...91 ...