USER MANUAL
17
10.
TIPS FOR ASSEMBLY AND DISASSEMBLY
Next, we will explain a series of instructions or recommendations to consider when using this
product.
10.1
BOARD EXTENTION
Choose a smooth, clean surface to unfold your board from the box or packing bag.
10.2
INFLATING THE BOARD:
• Connect the pressure gauge and pump hose to the pump casing and secure
it securely.
• Unscrew the valve cap and press the knob to make sure the valve is in the "Pin Out" position.
• Start pumping air into the dash by sliding the pump piston up and down.
• Inflate a little until you can secure the frame in the correct position.
Inflate and then reach the
required pressure.
TIP: If the pump piston starts to squeak, apply some silicone to the piston shaft.
OPERATION MINIMUM OF 10 PSI AND MAXIMUM OF 14 PSI. DO NOT GO BEYOND 14PSI (THIS WILL VOID
WARRANTY).
If the board is in hot weather, deflate slightly and allow the heat to build up the internal pressure, the cooler
water temperature may cause a slight pressure loss in the chamber. It's a good idea to take a pump with
you so you can add air if needed.
10.3
BOARD DEFLATION:
Before storing the board, you should clean it and rinse it with plenty of fresh water and neutral
soap. Let it dry, remove any water or debris, sand etc… from the valve areas.
Unscrew the cap and slowly tighten the valve stem to allow air to escape from the table. A
strong first puff of air will come out, but it will slow down very quickly.
Once the air outlet has slowed down, fully depress the valve stem and to lock it in the "OPEN"
position.
10.4
VALVE SEALING:
If there is a leak at the valve plug:
Use a black plastic wrench (provided) to disassemble the valve and check its position.
Valve position deviates: Find out the correct position. Cut off the extra finishing edge; Put an extra
sealing ring on top; Reassemble the valve and charge it to the recommended air pressure. No
deviation: Clean the threads on the surface of the base or the inner part. Reassemble the valve.
Inflate the board to its recommended pressure.
Tighten the valve further and inflate to the recommended air pressure.
For an air leak from inside the valve:
Remove the valve and check the position. Disassemble the seal remains on the valve and clean
both. Reassemble the valve and inflate the board until it is flat.