Stage 5:
Spacer Pipe
Three rows of spacer pipes are supplied to clamp between the hoops.
One row in the apex (Centre of roof) of the framework, the other two rows on either side. (Fig 7)
The fixing clamps covering the join between the hoops and upright posts (Fig 8)
and “T” clamps at ends.
(Fig 8a)
(Fig 7)
(Fig 8)
(Fig 8a)